
48
Controller doesn’t lite up.
Check to make sure the Power switch is “on”. Switch is located on the PLC enclosure.
Check 110v fuse on transformer is good. R/R if bad
Check E-stop – make sure it is pulled out.
Check round in- line fuse in the GSE controller. R/R if bad
Check for loose wire.
Bad LED display board
Dirty filling:
Insufficient dust collection pickup volume.
Bag seal not inflated enough. Material bypassing the seal.
Operator not putting the bag neck on the fill spout far enough.
Bad bag seal
Trouble shoot a Bad Load Cell:
LOAD CELL CONNECTION GUIDE
SHIELD
CLEAR EX BLACK
EX RED
SIGNAL -
WHITE
GREEN
SENSE -
BROWN
SENSE +
BLUE
Содержание 510
Страница 2: ...2 Safety Installation Operation Maintenance CBE 510 BULK BAGGER ...
Страница 11: ...11 CHAPTER 1 GENERAL INFORMATION ...
Страница 15: ...15 Chapter 2 INSTALLATION ...
Страница 19: ...19 Chapter 3 LOAD CELL WIRING ...
Страница 25: ...25 Chapter 4 Component Description ...
Страница 27: ...27 Chapter5 Optional Equipment ...
Страница 29: ...29 CHAPTER 6 SETUP OPERATING PROCEDURES ...
Страница 36: ...36 CHAPTER 7 PLC and AVERY 405 ADJUSTMENTS ...
Страница 40: ...40 Chapter 8 WEIGH CONTROLLER and ADJUSTMENTS ...
Страница 44: ...44 CHAPTER 9 MAINTENANCE ...
Страница 46: ...46 CHAPTER 10 TROUBLESHOOTING ...
Страница 50: ...50 ILLUSTRATED PARTS PAGES ...
Страница 51: ...51 ...
Страница 52: ...52 ...
Страница 53: ...53 ...
Страница 54: ...54 ...
Страница 55: ...55 ...
Страница 56: ...56 SCHEMATICS AND DRAWINGS ...
Страница 58: ...58 ...
Страница 59: ...59 ...
Страница 60: ...60 ...