
32
BAG SEAL CUFF (OPTIONAL)
The bag seal cuff is a feature that keeps the dust from coming out of the bulk bag during the filling
process.
A. Bag Cuff PB
The operator presses the blue PB to inflate and bag seal cuff. Check the pressure on the
regulator, to make sure the pressure is between 3-5 PSI to start. Adjust as need to make a
good seal inside the bulk bag sleeve. Once the pressure is determined set the regulator by
locking the regulator. Installing the sleeve and pressing the blue button will need to perform
at the beginning of each fill cycle.
Содержание 510
Страница 2: ...2 Safety Installation Operation Maintenance CBE 510 BULK BAGGER ...
Страница 11: ...11 CHAPTER 1 GENERAL INFORMATION ...
Страница 15: ...15 Chapter 2 INSTALLATION ...
Страница 19: ...19 Chapter 3 LOAD CELL WIRING ...
Страница 25: ...25 Chapter 4 Component Description ...
Страница 27: ...27 Chapter5 Optional Equipment ...
Страница 29: ...29 CHAPTER 6 SETUP OPERATING PROCEDURES ...
Страница 36: ...36 CHAPTER 7 PLC and AVERY 405 ADJUSTMENTS ...
Страница 40: ...40 Chapter 8 WEIGH CONTROLLER and ADJUSTMENTS ...
Страница 44: ...44 CHAPTER 9 MAINTENANCE ...
Страница 46: ...46 CHAPTER 10 TROUBLESHOOTING ...
Страница 50: ...50 ILLUSTRATED PARTS PAGES ...
Страница 51: ...51 ...
Страница 52: ...52 ...
Страница 53: ...53 ...
Страница 54: ...54 ...
Страница 55: ...55 ...
Страница 56: ...56 SCHEMATICS AND DRAWINGS ...
Страница 58: ...58 ...
Страница 59: ...59 ...
Страница 60: ...60 ...