![CBE 510 Скачать руководство пользователя страница 45](http://html.mh-extra.com/html/cbe/510/510_safety-installation-operation-maintenance_2575511045.webp)
45
MAINTENANCE OF THE BAG SEAL CUFF AND GAUGE:
Periodic inspection of the bag seal cuff for cracks or tears is necessary. Replacement of the cuff
is recommended if any wear, tears or thinning is noticed.
The pressure gauge should for the bag seal cuff should be kept in good working order. If the
gauge does not read pressure, remove and replace it as soon as possible to prevent cuff
damage.
BULK BAG INFLATOR / EXHAUST SYSTEM
Check plungers once a year
Check and clean air filter once a month
Butterfly and Actuator
Check seat of butterfly once a year
Содержание 510
Страница 2: ...2 Safety Installation Operation Maintenance CBE 510 BULK BAGGER ...
Страница 11: ...11 CHAPTER 1 GENERAL INFORMATION ...
Страница 15: ...15 Chapter 2 INSTALLATION ...
Страница 19: ...19 Chapter 3 LOAD CELL WIRING ...
Страница 25: ...25 Chapter 4 Component Description ...
Страница 27: ...27 Chapter5 Optional Equipment ...
Страница 29: ...29 CHAPTER 6 SETUP OPERATING PROCEDURES ...
Страница 36: ...36 CHAPTER 7 PLC and AVERY 405 ADJUSTMENTS ...
Страница 40: ...40 Chapter 8 WEIGH CONTROLLER and ADJUSTMENTS ...
Страница 44: ...44 CHAPTER 9 MAINTENANCE ...
Страница 46: ...46 CHAPTER 10 TROUBLESHOOTING ...
Страница 50: ...50 ILLUSTRATED PARTS PAGES ...
Страница 51: ...51 ...
Страница 52: ...52 ...
Страница 53: ...53 ...
Страница 54: ...54 ...
Страница 55: ...55 ...
Страница 56: ...56 SCHEMATICS AND DRAWINGS ...
Страница 58: ...58 ...
Страница 59: ...59 ...
Страница 60: ...60 ...