
18
Note:
If removing the controller from the equipment, secure the controller to the desired location and then the
load cell cable to the floor or wall. Re-connect the load cell cable to the weight indicator. Reference the
indicator User and Installation Guide for proper connections.
Take care not to stretch or bind cable
as this will affect weight readings.
Note: Depending on the model and configuration, your indicator may come pre-connected to
the scale.
Содержание 510
Страница 2: ...2 Safety Installation Operation Maintenance CBE 510 BULK BAGGER ...
Страница 11: ...11 CHAPTER 1 GENERAL INFORMATION ...
Страница 15: ...15 Chapter 2 INSTALLATION ...
Страница 19: ...19 Chapter 3 LOAD CELL WIRING ...
Страница 25: ...25 Chapter 4 Component Description ...
Страница 27: ...27 Chapter5 Optional Equipment ...
Страница 29: ...29 CHAPTER 6 SETUP OPERATING PROCEDURES ...
Страница 36: ...36 CHAPTER 7 PLC and AVERY 405 ADJUSTMENTS ...
Страница 40: ...40 Chapter 8 WEIGH CONTROLLER and ADJUSTMENTS ...
Страница 44: ...44 CHAPTER 9 MAINTENANCE ...
Страница 46: ...46 CHAPTER 10 TROUBLESHOOTING ...
Страница 50: ...50 ILLUSTRATED PARTS PAGES ...
Страница 51: ...51 ...
Страница 52: ...52 ...
Страница 53: ...53 ...
Страница 54: ...54 ...
Страница 55: ...55 ...
Страница 56: ...56 SCHEMATICS AND DRAWINGS ...
Страница 58: ...58 ...
Страница 59: ...59 ...
Страница 60: ...60 ...