
33
B. Bag Cuff Regulator and Quick Dump Exhaust Valve:
The regulator, gauge and quick dump valve are mounted directly to the bulk bag filler head.
The pressure adjustment was factory set to 3 PSI; however, this will need to be fine
adjusted in the field using the customer's bulk bag.
CAUTION:
Caution should be exercised when inflating the cuff. Over-
inflation could cause damage to the sleeve of the bulk bag and or
burst the cuff
Содержание 510
Страница 2: ...2 Safety Installation Operation Maintenance CBE 510 BULK BAGGER ...
Страница 11: ...11 CHAPTER 1 GENERAL INFORMATION ...
Страница 15: ...15 Chapter 2 INSTALLATION ...
Страница 19: ...19 Chapter 3 LOAD CELL WIRING ...
Страница 25: ...25 Chapter 4 Component Description ...
Страница 27: ...27 Chapter5 Optional Equipment ...
Страница 29: ...29 CHAPTER 6 SETUP OPERATING PROCEDURES ...
Страница 36: ...36 CHAPTER 7 PLC and AVERY 405 ADJUSTMENTS ...
Страница 40: ...40 Chapter 8 WEIGH CONTROLLER and ADJUSTMENTS ...
Страница 44: ...44 CHAPTER 9 MAINTENANCE ...
Страница 46: ...46 CHAPTER 10 TROUBLESHOOTING ...
Страница 50: ...50 ILLUSTRATED PARTS PAGES ...
Страница 51: ...51 ...
Страница 52: ...52 ...
Страница 53: ...53 ...
Страница 54: ...54 ...
Страница 55: ...55 ...
Страница 56: ...56 SCHEMATICS AND DRAWINGS ...
Страница 58: ...58 ...
Страница 59: ...59 ...
Страница 60: ...60 ...