STEP 6
Parts Required:
1 X Assembled PDB (from previous step)
1 X Assembled Main Frame Plate (from step 1)
4 X Flight Controller/FC Mount Screw (Black plastic M3 thread x 10mm long)
4 X PDB Spacer (Black plastic M3 hole)
4 X Flight Controller Hex Standoff (Black plastic M3 thread x 10mm long)
Assembly Process:
Install the PDB to the bottom of the main frame plate as shown. Be sure to use the PDB spacers to separate the PDB
from your carbon fiber main frame plate or you may short out the board.
Содержание 180-R
Страница 2: ...SECTION 01 BILL OF MATERIAL...
Страница 5: ...SECTION 02 REQUIRED TOOLS...
Страница 7: ...SECTION 03 BUILD PREPARATION...
Страница 9: ...SECTION 4 ASSEMBLY PROCESS...
Страница 11: ......
Страница 12: ......
Страница 13: ......
Страница 15: ......
Страница 16: ......
Страница 17: ......
Страница 19: ......
Страница 20: ......
Страница 22: ......
Страница 24: ......
Страница 26: ......
Страница 27: ......
Страница 28: ......
Страница 29: ......
Страница 31: ......
Страница 33: ......
Страница 34: ......
Страница 35: ......
Страница 36: ......
Страница 38: ......
Страница 40: ......
Страница 42: ......
Страница 43: ......
Страница 44: ......
Страница 46: ......
Страница 47: ......
Страница 48: ......
Страница 49: ......
Страница 50: ......
Страница 52: ......
Страница 53: ......
Страница 55: ......
Страница 56: ......
Страница 57: ......
Страница 58: ......
Страница 59: ......
Страница 61: ......
Страница 62: ......
Страница 63: ......
Страница 64: ......
Страница 65: ......
Страница 66: ...SECTION 5 HD CAMERA MOUNT INSTALL OPTIONAL...
Страница 68: ......
Страница 69: ......
Страница 70: ......
Страница 71: ......
Страница 72: ...SECTION 6 LIPO INSTALLATION...
Страница 74: ......