Carrier Yileng - Shanghai, China
3
6.6 - System minimum water volume
6.7 - Evaporator water flow rate
6.8 - Evaporator pressure drop curve
7.2 - Victaulic water connections
7.4 - Evaporator water box bolt tightening
7.6 - Operation of two units in master/slave mode
.............................................................................................. 37
8.1 Direct-drive twin-screw compressor with variable capacity slide valve
..................................................... 37
8.3 - High-pressure safety switch
8.6 - Electronic expansion valve (EXV)
10.2 - Level 2 maintenance (see note)
10.3 - Level 3 (or higher) maintenance (see note)
.............................................................................................. 42
10.4 - Tightening torques for the main electrical connections
........................................................................... 42
10.5 - Tightening torques for the main bolts and screws
.................................................................................... 43
10.9 - Precaution for compressor power supply bus bar connection
............................................................... 45
– START-UP CHECK LIST FOR 30XQ HEAT PUMP CHILLERS (USE FOR JOB FILE) ........................ 46
Содержание AquaForce 30XQ0330
Страница 48: ......
Страница 49: ...Version IOM_30XQ_E 1301_003 Supersede IOM_30XQ_E 1203_002 Effective Data Aug 2017 ...