46
Carrier Yileng - Shanghai, China
11
– START-UP CHECK LIST FOR 30XQ HEAT PUMP CHILLERS (USE FOR JOB FILE)
Preliminary information
Job name:..................................................................................................................................................................
Location:......................................................................................................................................................................
Installing contractor:....................................................................................................................................................
Distributor:....................................................................................................................................................................
Unit
Model:.............................................................................................
Compressors
Circuit A Circuit B
Model number............................................. ............. Model number.................................................................
Serial number........................................................... Serial number........................................................... ........
Motor number........................................................... Motor number........................................................... .........
Circuit C Circuit D
Model number............................................. ............. Model number................................................................
Serial number........................................................... Serial number........................................................... ........
Motor number........................................................... Motor number........................................................... .........
Evaporator
Model number................................................................................
Serial number.................................................................................
Condenser
Model number................................................................................
Additional optional units and accessories...................................................................................................................
.......................................................................................................................................................................................
Preliminary equipment check
Is there any shipping damage? ........................................If so, where?.....................................................................
......................................................................................................................................................................................
Will this damage prevent unit start-up?........................................................................................................................
□
Unit is level in its installation
□
Power supply agrees with the unit nameplate
□
Electrical circuit wiring has been sized and installed properly
□
Unit ground wire has been connected
□
Electrical circuit protection has been sized and installed properly
□
All terminals are tight
□
All chilled water valves are open
□
All chilled water piping is connected properly
□
All air has been vented from the chilled water circuit
□
Chilled water pump (CWP) is operating with the correct rotation. Check the phase sequence of the electrical connection.
After the pump test has been completed, switch the unit off again
□
Circulate chilled water in the water circuit for at least two hours, then remove, clean and replace the screen filter.
After the pump test has been completed, switch the unit off again.
□
Inlet piping to cooler includes a 20 mesh strainer with a mesh size of 1.2 mm.
□
condenser/ cooling Water quality should meet with Carrier requirements about heat exchanger water quality.
The compressor flange has been removed.
Содержание AquaForce 30XQ0330
Страница 48: ......
Страница 49: ...Version IOM_30XQ_E 1301_003 Supersede IOM_30XQ_E 1203_002 Effective Data Aug 2017 ...