2
Carrier Yileng - Shanghai, China
Contents
1.1 - Installation safety considerations
1.2 - Equipment and components under pressure
................................................................................................ 4
1.3 - Maintenance safety considerations
1.4 - Repair safety considerations
2.1 - Check equipment received
2.2 - Moving and siting the unit
3.11 - 30XQ1300/1340/1370/1400/1450/1502
3.12 - Multiple chiller installation
4.1 30XQ0330-0702 physical data
4.2 30XQ745-1102 physical data
4.3 30XQ1150-1502 physical data
4.5 Short-circuit stability current for all units
4.6 - Compressor electrical data
4.7 - Compressor usage per circuit (A, B, C, D)
5.2 - Voltage phase imbalance (%)
5.3 - Power connection/disconnect switch
5.4 - Recommended wire sections
5.5 - Selection table of minimum and maximum wire sections for connection
............................................... 26
6.3 - Minimum chilled water flow (units without hydraulic module)
................................................................... 29
6.4 - Maximum chilled water flow (units without hydraulic module)
.................................................................. 29
Содержание AquaForce 30XQ0330
Страница 48: ......
Страница 49: ...Version IOM_30XQ_E 1301_003 Supersede IOM_30XQ_E 1203_002 Effective Data Aug 2017 ...