T-365
7–10
:
Figure 7.6 Compressor Ports/Connections
17.Connect the new compressor dome temperature sensor with the old sensor wires removed in step i using
butt-splices and heat shrinks. Wire-tie any loose wiring as appropriate.
18.Open the compressor terminal cover and connect the compressor power cable following the steps below:
a. Liberally coat the orange gasket (
, item #11) surfaces with the Krytox lubricant (
item #13) as shown in
Figure 7.7 Lubricating Orange Gasket
b. Install the orange gasket part onto the compressor fusite with the grooved or threaded side out as shown
in
. Ensure that the gasket is seated onto the fusite base.
Service Valve / Connection
Torque Value
1
Suction and Discharge Rotalocks
108.5 to 135.5 Nm (80 to 100 ft-lbs.)
2
Unloader connection
24.5 to 27 Nm (18 to 20 ft-lbs.)
3
Economized connection
32.5 to 35 Nm (24 to 26 ft-lbs.)
3
2
1
DLV
DUV
Содержание 69NT40-561-300
Страница 2: ......
Страница 4: ......
Страница 10: ......
Страница 14: ......
Страница 22: ......
Страница 34: ......
Страница 108: ......
Страница 116: ......
Страница 164: ...T 365 8 2 Figure 8 2 Unit Wiring Diagram Based on Drawing 62ï11755 ...
Страница 165: ...8 3 T 365 Figure 8 3 Wiring Diagram Based on Drawing 62ï11755 ...
Страница 166: ...T 365 8 4 Figure 8 4 Wiring Diagram Based on Drawing 62ï11755 ...
Страница 168: ......
Страница 172: ......
Страница 173: ......