background image

Recheck temperature rise. It must be within limits specified
on unit rating plate. Recommended operation is at midpoint of
rise or above.

3. Set thermostat heat anticipator.

The thermostat heat anticipation must be set to match the amp
draw of the electrical components in the R-W circuit. Accurate
amp draw readings can be obtained at thermostat subbase
terminals R and W. Fig. 16 illustrates an easy method of
obtaining the actual amp draw. The amp reading should be
taken after the blower motor has started. See the thermostat
manufacturer’s instructions for adjusting the heat anticipator
and for varying the heating cycle length.

NOTE:

When using an electronic thermostat, set cycle rate for 3

cycles per hr.

CHECK SAFETY CONTROLS

The flame sensor, gas valve, and pressure switch were all checked
in the Start-Up Procedures section as part of normal operation.

1. Check primary limit control.

This control shuts off the combustion control system and
energizes the circulating-air blower motor if the furnace
overheats.

The preferred method of checking the limit control is to
gradually block off the return air after the furnace has been
operating for a period of at least 5 minutes. As soon as the
limit has shut off the burners, the return-air opening should be
unblocked. By using this method to check the limit control, it
can be established that the limit is functioning properly and
operates if there is a motor failure.

2. Check draft safeguard switch.

The purpose of this control is to permit the safe shutdown of
the furnace during certain blocked vent conditions.

Table 8—Gas Rate (Cu Ft/Hr)

SECONDS

FOR 1

REVOLUTION

SIZE OF TEST DIAL

SECONDS

FOR 1

REVOLUTION

SIZE OF TEST DIAL

1

cu ft

2

cu ft

5

cu ft

1

cu ft

2

cu ft

5

cu ft

10
11
12
13
14

360
327
300
277
257

720
655
600
555
514

1800
1636
1500
1385
1286

50
51
52
53
54

72
71
69
68
67

144
141
138
136
133

360
355
346
340
333

15
16
17
18
19

240
225
212
200
189

480
450
424
400
379

1200
1125
1059
1000

947

55
56
57
58
59

65
64
63
62
61

131
129
126
124
122

327
321
316
310
305

20
21
22
23
24

180
171
164
157
150

360
343
327
313
300

900
857
818
783
750

60
62
64
66
68

60
58
56
54
53

120
116
112
109
106

300
290
281
273
265

25
26
27
28
29

144
138
133
129
124

288
277
267
257
248

720
692
667
643
621

70
72
74
76
78

51
50
48
47
46

103
100

97
95
92

257
250
243
237
231

30
31
32
33
34

120
116
113
109
106

240
232
225
218
212

600
581
563
545
529

80
82
84
86
88

45
44
43
42
41

90
88
86
84
82

225
220
214
209
205

35
36
37
38
39

103
100

97
95
92

206
200
195
189
185

514
500
486
474
462

90
92
94
96
98

40
39
38
38
37

80
78
76
75
74

200
196
192
188
184

40
41
42
43
44

90
88
86
84
82

180
176
172
167
164

450
439
429
419
409

100
102
104
106
108

36
35
35
34
33

72
71
69
68
67

180
178
173
170
167

45
46
47
48
49

80
78
76
75
73

160
157
153
150
147

400
391
383
375
367

110
112
116
120

33
32
31
30

65
64
62
60

164
161
155
150

Fig. 14—Redundant Automatic Gas Control Valve

A90044

OFF

MANIFOLD
PRESSURE  TAP

CONTROL
KNOB

GAS
PRESSURE
REGULATOR
ADJUSTMENT

INLET
PRESSURE  TAP

Fig. 15—Burner Flame

A89020

BURNER  FLAME

BURNER

MANIFOLD

Table 9—Canadian Orifice Size

GAS

SEA LEVEL 0-2000

FT

HIGH ALTITUDE

2000-4500 FT

Natural

43

44

Propane

54

55

Table 10—Speed Selector

COLOR

SPEED

FACTORY

ATTACHED TO

Black

High

COOL

Yellow

(When present)

Medium-High

SPARE

Blue

Medium-Low

HEAT

Red

Low

SPARE

White

Common

COM

14

Содержание 58RAV Series

Страница 1: ...erve precautions in the literature on tags and on labels attached to or shipped with the unit and other safety precautions that may apply Follow all safety codes In the United States follow all safety codes including the National Fuel Gas Code NFGC NFPA No 54 1992 ANSI Z223 1 1992 In Canada refer to the current ama CANADIAN GAS ASSOCIATION APPROVED R Table 1 Clearances From Combustible Materials I...

Страница 2: ...charges from personnel and hand tools which are held during the procedure These precautions will help to avoid exposing the control to electrostatic discharge by putting the furnace the control and the person at the same electrostatic potential 1 Disconnect all power to the furnace DO NOT TOUCH THE CONTROL OR ANY WIRE CONNECTED TO THE CON TROL PRIOR TO DISCHARGING YOUR BODY S ELEC TROSTATIC CHARGE...

Страница 3: ...e personal injury or death For accessory installation details refer to the applicable installa tion literature NOTE Remove all shipping brackets and materials before oper ating the furnace Step 1 Location GENERAL Do not install furnace in a corrosive or contaminated atmo sphere Make sure all combustion and circulating air require ments are followed in addition to all local codes and ordinances Do ...

Страница 4: ...sume that wood louvers have a 20 percent free area and metal louvers or grilles have a 60 percent free area Screens when used must not be smaller than 1 4 in mesh Louvers and grilles must be constructed so they cannot be closed The size of the openings depends upon whether the air comes from inside or outside the structure 1 All air from inside the structure a Each opening MUST have at least 1 sq ...

Страница 5: ...12 MAX 1 SQ IN PER 4000 BTUH OUTDOORS 1 SQ IN PER 4000 BTUH 1 SQ IN PER 2000 BTUH 12 MAX Use any of the following combinations of openings A B C D D E F G NOTE Minimum dimensions of 3 In F G For Example 58RAV FURNACE INPUT BTUH FREE AREA PER OPENING SQ IN ROUND PIPE IN DIA 46 000 11 5 4 69 000 17 3 5 92 000 23 0 6 115 000 28 8 7 135 000 34 5 7 For Example 58RAV FURNACE INPUT BTUH FREE AREA PER OPE...

Страница 6: ...rom each corner by hanger bolts 4 each 3 8 in all thread rod cut to desired length 1 X 3 8 in flat washer 3 8 in lockwasher and 3 8 in nut Dimples are provided for hole locations See Fig 1 Since horizontal crawlspace installation is very similar to the attic installation refer to Step 4 The installation of a sheet metal shield in front of the louvered control panel is covered in Step 4 For a crawl...

Страница 7: ... 1 8 in NPT plugged tapping accessible for test gage connection must be installed immediately upstream of the gas supply connection to the furnace and downstream of the manual shut off valve Place a ground joint union between the gas control manifold and the manual shut off Install a sediment trap in the riser leading to the furnace The trap can be installed by connecting a tee to the riser leadin...

Страница 8: ...in control board Any direct shorts during installation service or maintenance could cause this fuse to blow If fuse replacement is required use ONLY a 3 amp fuse of identical size ACCESSORIES 1 Electronic air cleaner EAC Two quick connect terminals marked EAC 1 and EAC 2 are provided for EAC connection See Fig 11 These terminals are energized with 115v 1 5 amp maximum during blower motor operation...

Страница 9: ...TE 2 FIELD SUPPLIED FUSED DISCONNECT CONDENSING UNIT TWO WIRE FURNACE R G C W C R G Y GND GND FIELD 24 VOLT WIRING FIELD 115 208 230 460 VOLT WIRING FACTORY 24 VOLT WIRING FACTORY 115 VOLT WIRING 208 230 OR 460 VOLT THREE PHASE 208 230 VOLT SINGLE PHASE WHT BLK WHT BLK NOTES Connect Y terminal as shown for proper operation Some thermostats require a C terminal connection as shown If any of the ori...

Страница 10: ...or cooling R G and R Y circuits close The R Y circuit starts the outdoor condensing unit and combined R Y and R G circuits start the furnace blower motor on cooling speed The EAC 1 terminal is energized with 115v whenever the blower is operating on cooling speed When the thermostat is satisfied R G and R Y circuits are broken Furnace blower and EAC continue operating on cooling speed for an additi...

Страница 11: ...COMPONENT TEST TWIN TERMINAL TRAN TRANSFORMER 115VAC 24VAC JUNCTION UNMARKED TERMINAL PCB TERMINAL FACTORY WIRING 115VAC FACTORY WIRING 24VAC FIELD WIRING 115VAC FIELD WIRING 24VAC CONDUCTOR ON PCB FIELD WIRING TERMINAL FIELD GROUND EQUIPMENT GROUND FIELD SPLICE PLUG RECEPTACLE L1 NEUTRAL L1 BLWR HI LO TO 115VAC FIELD DISCONNECT NOTE 4 EQUIPMENT GROUND SPARE 1 HEAT SPARE 2 COOL NOTE 8 COM HSIR EAC...

Страница 12: ... given natural gas conditions EXAMPLE Heat value 1070 Btu cu ft Specific gravity 0 58 Therefore Orifice No 44 Manifold pressure 3 6 in wc The furnace is shipped with No 43 orifices Therefore in this example all main burner orifices must be changed and the manifold pressure must be adjusted 7 Proceed to item c to adjust manifold pressure b Check gas input rate by clocking gas meter 1 Obtain average...

Страница 13: ... 40 41 3 2 3 5 40 41 3 3 3 6 40 41 39 3 4 3 7 3 2 40 41 39 3 5 3 8 3 3 40 38 39 3 6 3 2 3 4 40 38 39 3 8 3 3 3 5 38 39 3 4 3 6 38 39 3 4 3 7 890 41 42 3 2 3 6 41 42 3 4 3 7 40 41 3 2 3 5 40 41 3 3 3 6 40 41 39 3 4 3 7 3 2 40 41 39 3 5 3 8 3 3 40 39 3 6 3 4 40 38 39 3 7 3 2 3 5 40 38 39 3 8 3 3 3 6 905 42 3 5 41 42 3 2 3 6 41 42 3 4 3 7 40 41 3 2 3 5 40 41 3 3 3 6 40 41 39 3 4 3 7 3 2 40 41 39 3 5 ...

Страница 14: ... 8 Gas Rate Cu Ft Hr SECONDS FOR 1 REVOLUTION SIZE OF TEST DIAL SECONDS FOR 1 REVOLUTION SIZE OF TEST DIAL 1 cu ft 2 cu ft 5 cu ft 1 cu ft 2 cu ft 5 cu ft 10 11 12 13 14 360 327 300 277 257 720 655 600 555 514 1800 1636 1500 1385 1286 50 51 52 53 54 72 71 69 68 67 144 141 138 136 133 360 355 346 340 333 15 16 17 18 19 240 225 212 200 189 480 450 424 400 379 1200 1125 1059 1000 947 55 56 57 58 59 6...

Страница 15: ...econnect inducer motor wires replace control door and turn on 115 v power to furnace 4 Check auxiliary limits when used a Turn off 115 v power to furnace b Remove blower access door c Disconnect red motor lead at blower speed selector Mark terminal for proper re connection d Replace blower access door e Turn on 115 v power to furnace Be sure room thermostat is calling for heat f Allow furnace to o...

Страница 16: ...ce Training plus hands on the products in our labs can mean increased confidence that really pays dividends in faster troubleshooting fewer callbacks Course descriptions and schedules are in our catalog CALL FOR FREE CATALOG 1 800 962 9212 Packaged Service Training Classroom Service Training Copyright 1995 CARRIER Corp 7310 W Morris St Indianapolis IN 46231 58ra10si Manufacturer reserves the right...

Отзывы: