Before operating the furnace, check each manual reset switch for
continuity. If necessary, press the button to reset the switch.

The blower compartment door must be in place to complete the
115-v circuit to the furnace.

This furnace is equipped with 2 manual reset limit switches in
the gas control area. The switches will open and shut off
power to the gas valve if a flame rollout or an overheating
condition occurs in the gas control area. DO NOT bypass the
switches. Correct inadequate combustion air supply problem
and reset the switches.

SEQUENCE OF OPERATION

Furnace control must be grounded for proper operation or
control will lockout. Control is grounded through green wire
routed to gas valve and burner bracket screw.

Using the schematic diagram shown in Fig. 13, follow the
sequence of operation through the different modes. Read and
follow the wiring diagram very carefully.

NOTE:

If there is a power interruption and any thermostat call,

the control will initiate a 90-sec blower only on period before
starting another cycle.

1. Heating mode

When the thermostat "calls for heat," R-W circuit closes. The
furnace control performs a self-check, verifies the pressure
switch contacts are open, and starts the inducer motor.

a. Prepurge period—As the inducer motor comes up to speed,

the pressure switch contacts close to begin a 15-sec
prepurge period.

b. Ignitor warm-up—At the end of the prepurge period, the

ignitor is energized for a 17-sec ignitor warm-up period.

c. Ignition sequence—When the ignitor warm-up period is

completed, the gas valve opens, permitting gas flow to the
burners where it is ignited. After 5 sec, the ignitor is
de-energized and a 2-sec flame-sensing period begins.

d. HUM terminal is energized with the gas valve. See

Accessories in Electrical Connections section.

e. Flame-sensing—When burner flame is sensed, the control

begins the blower on delay period and continues holding
the gas valve open. If burner flame is not sensed, the
control closes the gas valve and repeats the ignition cycle.

NOTE:

Ignition sequence will repeat 3 additional times before a

lockout occurs. Lockout automatically resets after 3 hrs, or can be
manually reset by turning 115v off (not at thermostat) for 3 sec
minimum, then on again.

f. Blower on delay—Forty sec after burner flame is proven,

the blower motor is energized on heating speed. Simulta-
neously, the humidifier and electronic air cleaner terminals
(HUM and Com for humidifier, EAC-1 and EAC-2 for
electronic air cleaner) are energized.

g. Blower off delay—When the thermostat is satisfied, the

circuit between R and W is broken, de-energizing the gas
valve and stopping gas flow to the burners. The blower
motor, and EAC remain energized for 135 sec.

h. Post-purge—The inducer motor remains energized 5 sec

after the burners are extinguished.

2. Cooling mode

When the thermostat "calls for cooling," R-G and R-Y circuits
close. The R-Y circuit starts the outdoor condensing unit and
combined R-Y and R-G circuits start the furnace blower motor
on cooling speed. The EAC-1 terminal is energized with 115v
whenever the blower is operating on cooling speed.

When the thermostat is satisfied, R-G and R-Y circuits are
broken. Furnace blower and EAC continue operating on
cooling speed for an additional 90 sec.

3. Continuous blower mode

NOTE:

EAC-1 terminal is energized with 115v whenever blower

is operating.

When the R-G circuit is made, the blower motor operates on
heating speed. During a call for heat, the blower stops,
allowing the furnace heat exchangers to heat up more quickly,
then restarts at the end of the 40-sec blower on delay period.

The blower reverts to continuous operation after the heating
cycle is completed.

When the thermostat "calls for cooling," the blower operates
on cooling speed. When the thermostat is satisfied, the blower
operates an additional 90 sec before reverting back to con-
tinuous operation on heating speed.

4. Heat pump mode

When installed with a heat pump, the furnace control auto-
matically changes the timing sequence to avoid long blower
off time during demand defrost cycles. When the W-Y or
W-Y-G thermostat inputs are received at the same time, the
control changes the blower to heating speed or starts the
blower if it was off, and begins a heating cycle. The blower
remains on until the end of the prepurge period, then shuts off
until the end of the ignition warm up and trial for ignition
periods (a total of 24 sec). The blower then comes back on at
heating speed.

When the W input signal disappears, the control begins the
normal inducer post-purge period and the blower changes to
cooling speed after a 1-sec delay. If the W-Y-G signals
disappear at the same time, the blower remains on for the
selected heating blower off delay period and the inducer goes
through its normal post-purge period. If the W-Y inputs
should disappear, leaving the G signal input, the control goes
into continuous blower and the inducer remains on for the
normal post-purge period.

Anytime the control senses false flame, the control locks out
of the heating mode. This occurs because the control cannot
sense the W input due to the false flame signal and, as a result,
sees only the Y input and goes into cooling mode blower off
delay. All other control functions remain in standard format.

NOTE:

EAC-1 terminal is energized whenever blower operates.

HUM terminal is only energized when gas valve is energized.

START-UP PROCEDURES

1. Purge gas lines—After all connections have been made, purge

the lines and check for leaks.

Never purge a line into a combustion chamber. Never use
matches, candles, flame or other sources of ignition to check
for gas leakage. Use a soap-and-water solution to check for
gas leaks. Failure to follow this warning could result in fire,
explosion, personal injury, or death.

2. Component test—The furnace control allows all components,

except gas valve, to be run for a short period of time.

10

Содержание 58RAV Series

Страница 1: ...erve precautions in the literature on tags and on labels attached to or shipped with the unit and other safety precautions that may apply Follow all safety codes In the United States follow all safety codes including the National Fuel Gas Code NFGC NFPA No 54 1992 ANSI Z223 1 1992 In Canada refer to the current ama CANADIAN GAS ASSOCIATION APPROVED R Table 1 Clearances From Combustible Materials I...

Страница 2: ...charges from personnel and hand tools which are held during the procedure These precautions will help to avoid exposing the control to electrostatic discharge by putting the furnace the control and the person at the same electrostatic potential 1 Disconnect all power to the furnace DO NOT TOUCH THE CONTROL OR ANY WIRE CONNECTED TO THE CON TROL PRIOR TO DISCHARGING YOUR BODY S ELEC TROSTATIC CHARGE...

Страница 3: ...e personal injury or death For accessory installation details refer to the applicable installa tion literature NOTE Remove all shipping brackets and materials before oper ating the furnace Step 1 Location GENERAL Do not install furnace in a corrosive or contaminated atmo sphere Make sure all combustion and circulating air require ments are followed in addition to all local codes and ordinances Do ...

Страница 4: ...sume that wood louvers have a 20 percent free area and metal louvers or grilles have a 60 percent free area Screens when used must not be smaller than 1 4 in mesh Louvers and grilles must be constructed so they cannot be closed The size of the openings depends upon whether the air comes from inside or outside the structure 1 All air from inside the structure a Each opening MUST have at least 1 sq ...

Страница 5: ...12 MAX 1 SQ IN PER 4000 BTUH OUTDOORS 1 SQ IN PER 4000 BTUH 1 SQ IN PER 2000 BTUH 12 MAX Use any of the following combinations of openings A B C D D E F G NOTE Minimum dimensions of 3 In F G For Example 58RAV FURNACE INPUT BTUH FREE AREA PER OPENING SQ IN ROUND PIPE IN DIA 46 000 11 5 4 69 000 17 3 5 92 000 23 0 6 115 000 28 8 7 135 000 34 5 7 For Example 58RAV FURNACE INPUT BTUH FREE AREA PER OPE...

Страница 6: ...rom each corner by hanger bolts 4 each 3 8 in all thread rod cut to desired length 1 X 3 8 in flat washer 3 8 in lockwasher and 3 8 in nut Dimples are provided for hole locations See Fig 1 Since horizontal crawlspace installation is very similar to the attic installation refer to Step 4 The installation of a sheet metal shield in front of the louvered control panel is covered in Step 4 For a crawl...

Страница 7: ... 1 8 in NPT plugged tapping accessible for test gage connection must be installed immediately upstream of the gas supply connection to the furnace and downstream of the manual shut off valve Place a ground joint union between the gas control manifold and the manual shut off Install a sediment trap in the riser leading to the furnace The trap can be installed by connecting a tee to the riser leadin...

Страница 8: ...in control board Any direct shorts during installation service or maintenance could cause this fuse to blow If fuse replacement is required use ONLY a 3 amp fuse of identical size ACCESSORIES 1 Electronic air cleaner EAC Two quick connect terminals marked EAC 1 and EAC 2 are provided for EAC connection See Fig 11 These terminals are energized with 115v 1 5 amp maximum during blower motor operation...

Страница 9: ...TE 2 FIELD SUPPLIED FUSED DISCONNECT CONDENSING UNIT TWO WIRE FURNACE R G C W C R G Y GND GND FIELD 24 VOLT WIRING FIELD 115 208 230 460 VOLT WIRING FACTORY 24 VOLT WIRING FACTORY 115 VOLT WIRING 208 230 OR 460 VOLT THREE PHASE 208 230 VOLT SINGLE PHASE WHT BLK WHT BLK NOTES Connect Y terminal as shown for proper operation Some thermostats require a C terminal connection as shown If any of the ori...

Страница 10: ...or cooling R G and R Y circuits close The R Y circuit starts the outdoor condensing unit and combined R Y and R G circuits start the furnace blower motor on cooling speed The EAC 1 terminal is energized with 115v whenever the blower is operating on cooling speed When the thermostat is satisfied R G and R Y circuits are broken Furnace blower and EAC continue operating on cooling speed for an additi...

Страница 11: ...COMPONENT TEST TWIN TERMINAL TRAN TRANSFORMER 115VAC 24VAC JUNCTION UNMARKED TERMINAL PCB TERMINAL FACTORY WIRING 115VAC FACTORY WIRING 24VAC FIELD WIRING 115VAC FIELD WIRING 24VAC CONDUCTOR ON PCB FIELD WIRING TERMINAL FIELD GROUND EQUIPMENT GROUND FIELD SPLICE PLUG RECEPTACLE L1 NEUTRAL L1 BLWR HI LO TO 115VAC FIELD DISCONNECT NOTE 4 EQUIPMENT GROUND SPARE 1 HEAT SPARE 2 COOL NOTE 8 COM HSIR EAC...

Страница 12: ... given natural gas conditions EXAMPLE Heat value 1070 Btu cu ft Specific gravity 0 58 Therefore Orifice No 44 Manifold pressure 3 6 in wc The furnace is shipped with No 43 orifices Therefore in this example all main burner orifices must be changed and the manifold pressure must be adjusted 7 Proceed to item c to adjust manifold pressure b Check gas input rate by clocking gas meter 1 Obtain average...

Страница 13: ... 40 41 3 2 3 5 40 41 3 3 3 6 40 41 39 3 4 3 7 3 2 40 41 39 3 5 3 8 3 3 40 38 39 3 6 3 2 3 4 40 38 39 3 8 3 3 3 5 38 39 3 4 3 6 38 39 3 4 3 7 890 41 42 3 2 3 6 41 42 3 4 3 7 40 41 3 2 3 5 40 41 3 3 3 6 40 41 39 3 4 3 7 3 2 40 41 39 3 5 3 8 3 3 40 39 3 6 3 4 40 38 39 3 7 3 2 3 5 40 38 39 3 8 3 3 3 6 905 42 3 5 41 42 3 2 3 6 41 42 3 4 3 7 40 41 3 2 3 5 40 41 3 3 3 6 40 41 39 3 4 3 7 3 2 40 41 39 3 5 ...

Страница 14: ... 8 Gas Rate Cu Ft Hr SECONDS FOR 1 REVOLUTION SIZE OF TEST DIAL SECONDS FOR 1 REVOLUTION SIZE OF TEST DIAL 1 cu ft 2 cu ft 5 cu ft 1 cu ft 2 cu ft 5 cu ft 10 11 12 13 14 360 327 300 277 257 720 655 600 555 514 1800 1636 1500 1385 1286 50 51 52 53 54 72 71 69 68 67 144 141 138 136 133 360 355 346 340 333 15 16 17 18 19 240 225 212 200 189 480 450 424 400 379 1200 1125 1059 1000 947 55 56 57 58 59 6...

Страница 15: ...econnect inducer motor wires replace control door and turn on 115 v power to furnace 4 Check auxiliary limits when used a Turn off 115 v power to furnace b Remove blower access door c Disconnect red motor lead at blower speed selector Mark terminal for proper re connection d Replace blower access door e Turn on 115 v power to furnace Be sure room thermostat is calling for heat f Allow furnace to o...

Страница 16: ...ce Training plus hands on the products in our labs can mean increased confidence that really pays dividends in faster troubleshooting fewer callbacks Course descriptions and schedules are in our catalog CALL FOR FREE CATALOG 1 800 962 9212 Packaged Service Training Classroom Service Training Copyright 1995 CARRIER Corp 7310 W Morris St Indianapolis IN 46231 58ra10si Manufacturer reserves the right...

Отзывы: