![Carrier 38APD115 Скачать руководство пользователя страница 233](http://html.mh-extra.com/html/carrier/38apd115/38apd115_manual_2560531233.webp)
CL-5
III. SYSTEM START-UP (to be completed by the start-up technician)
A. PRE-START CHECK
1. ALL SERVICE VALVES OPEN.
YES
NO
2. COMPRESSOR OIL LEVEL IS CORRECT.
YES
NO
3. VERIFY COMPRESSOR MOUNTING BOLT TORQUE IS
10 TO 14 ft-lbs (13.5 TO 18.9 N-m)
YES
NO
4. LOCATE, REPAIR, AND REPORT ANY LEAKS. _______________________________________________
________________________________________________________________________________________
5. SUPPLY VOLTAGE IS WITHIN UNIT NAMEPLATE RANGE.
YES
NO
6. CONTROL TRANSFORMER(S) PRIMARY CONNECTION SET
FOR PROPER VOLTAGE.
YES
NO
7. CONTROL TRANSFORMER (TRAN1) SECONDARY VOLTAGE
________________
vac
CONTROL TRANSFORMER (TRAN2) SECONDARY VOLTAGE
________________
vac
8. CHECK VOLTAGE PHASE IMBALANCE:
AB: ______ V AC: ______ V BC: ______ V
AVERAGE VOLTAGE (AB + AC + BC)/3:
______
V
MAXIMUM DEVIATION FROM AVERAGE VOLTAGE:
______
V
VOLTAGE IMBALANCE: MAXIMUM DEVIATION/AVERAGE VOLTAGE x 100
______
%
9. VOLTAGE IMBALANCE LESS THAN 2%.
YES
NO
DO NOT START UNIT IF VOLTAGE IMBALANCE IS GREATER THAN 2%.
CONTACT LOCAL UTILITY FOR ASSISTANCE.
10. EVAPORATOR FAN SWITCH(ES) OPERATIONAL, IF INSTALLED.
N/A
YES
NO
11. PROPER CONDENSER FAN ROTATION CONFIRMED.
YES
NO
12. PROPER EVAPORATOR FAN ROTATION CONFIRMED.
YES
NO
13. RECORD SOFTWARE VERSION INFORMATION.
PRESS [ENTER] AND [ESCAPE] TO OBTAIN SOFTWARE VERSIONS.
YES
NO
Run Status
o
VERS
SOFTWARE VERSION NUMBERS
MBB
CESR131466—
__________ —
____________
AUX
CESR131333—
__________ —
____________
CXB
CESR131173—
__________ —
____________
EMM
CESR131174—
__________ —
____________
MARQ
CESR131171—
__________ —
____________
NAVI
CESR130227—
__________ —
____________
14. TIME AND DATE SET PROPERLY.
YES
NO