93
Table 14A — 23XL Waterbox Cover Weights (Frame 1 and 2 Machines)*
LEGEND
NIH — Nozzle-In-Head
*These weights are given for reference only. They have been included in heat exchanger weights
shown in Table 4.
NOTE: Add 30 lb (14 Kg) for bolts.
Table 14B — 23XL Waterbox Cover Weight (Frame 4 Machines)*
LEGEND
*These weights are given for reference only. The 150 psig (1034 kPa) standard waterbox cover
weights have been included in the heat exchanger weights shown in Table 11.
HEAT
EXCHANGER
WATERBOX
DESCRIPTION
PSI
(kPa)
FRAME 1
FRAME 2
lbs
kg
lbs
kg
COOLER OR
CONDENSER
NIH, 1 Pass
150
(1034)
118
54
128
58
NIH, 2 Pass (Plain)
100
46
148
67
NIH, 2 Pass (With Pipe Nozzles)
185
84
200
91
NIH, 3 Pass
150
(1034)
166
76
180
82
HEAT
EXCHANGER
WATERBOX
DESCRIPTION
ENGLISH (lb)
SI (kg)
Frame 4,
Std Nozzles
Frame 4,
Flanged
Frame 4,
Std Nozzles
Frame 4,
Flanged
150 psig
300 psig
150 psig
300 psig
1034 kPa
2068 kPa
1034 kPa
2068 kPa
COOLER
NIH, 1 Pass Cover
284
414
324
491
129
188
147
223
NIH, 2 Pass Cover
285
411
341
523
129
187
155
237
NIH, 3 Pass Cover
292
433
309
469
133
197
140
213
NIH, Plain End Cover
243
292
243
292
110
133
110
133
MWB Cover
CS
621
CS
621
CS
282
CS
282
Plain End Cover
CS
482
CS
482
CS
219
CS
219
CONDENSER
NIH, 1 Pass Cover
306
446
346
523
139
202
157
237
NIH, 2 Pass Cover
288
435
344
547
131
197
156
248
NIH, 3 Pass Cover
319
466
336
502
145
212
153
228
NIH, Plain End Cover
226
271
226
271
103
123
103
123
MWB Cover
CS
474
CS
474
CS
215
CS
215
Plain End Cover
CS
359
CS
359
CS
163
CS
163
CS
— Contact Syracuse
MWB — Marine Waterbox
NIH
— Nozzle-In-Head
Содержание 23XL
Страница 18: ...18 Fig 15 Control Panel Fig 16 Power Panel ...
Страница 51: ...51 Fig 31 23XL Leak Test Procedure ...
Страница 52: ...52 Fig 32 Typical Optional Pumpout System Piping Schematic with Storage Tank TC Frame 1 and 2 Chillers ...
Страница 53: ...53 Fig 33 Typical Optional Pumpout System Piping Schematic With Storage Tank TD Frame 4 Chillers ...
Страница 54: ...54 Fig 34 Typical Optional Pumpout System Piping Schematic Without Storage Tank TC Frame 1 and 2 Chillers ...
Страница 55: ...55 Fig 35 Typical Optional Pumpout System Piping Schematic Without Storage Tank TD Frame 4 Chillers ...
Страница 99: ...99 Fig 49 Benshaw Inc Solid State Unit Mounted Starter Wiring Schematic Low Voltage ...