
CL-3
C
U
T
A
L
O
N
G
DO
T
T
E
D L
INE
CUT
A
L
O
N
G
DO
T
T
E
D L
INE
- - - -
- - - -
-
- - - -
-
- - - -
- - - - -
- - - - -
- - - -
-
- - - -
-
- - - -
-
- - - -
- - - - -
- - - -
-
- - - -
-
- -
- -
-
- - - -
- - - - -
- - - - -
- - - -
-
- - - -
-
- - - -
- - - - -
- - - - -
- - - -
-
- - - -
-
- - - -
-
- - - -
- - - -
-
- - - - -
- - - -
-
- - - -
-
- - - -
- - - - -
- - - - -
- - - -
-
- - - -
-
- - - -
- - - -
23XL PIC II SETPOINT TABLE CONFIGURATION SHEET
CVC Software Version Number:
CVC Controller Identification:
BUS:
ADDRESS:
DESCRIPTION
RANGE
UNITS
DEFAULT
VALUE
Base Demand Limit
40 to 100
%
100
LCW Setpoint
10 to 120
DEG F
50.0
ECW Setpoint
15 to 120
DEG F
60.0
Ice Build Setpoint
15 to 60
DEG F
40.0
Tower Fan High Setpoint
55 to 105
DEG F
75
Содержание 23XL
Страница 18: ...18 Fig 15 Control Panel Fig 16 Power Panel ...
Страница 51: ...51 Fig 31 23XL Leak Test Procedure ...
Страница 52: ...52 Fig 32 Typical Optional Pumpout System Piping Schematic with Storage Tank TC Frame 1 and 2 Chillers ...
Страница 53: ...53 Fig 33 Typical Optional Pumpout System Piping Schematic With Storage Tank TD Frame 4 Chillers ...
Страница 54: ...54 Fig 34 Typical Optional Pumpout System Piping Schematic Without Storage Tank TC Frame 1 and 2 Chillers ...
Страница 55: ...55 Fig 35 Typical Optional Pumpout System Piping Schematic Without Storage Tank TD Frame 4 Chillers ...
Страница 99: ...99 Fig 49 Benshaw Inc Solid State Unit Mounted Starter Wiring Schematic Low Voltage ...