22
NEXT
PREVIOUS
SELECT
EXIT
SERVICE TABLE
Display Alarm History
(The table holds up to 25 alarms and
alerts with the most recent alarm
at the top of the screen.)
• CCM Thermistors
• CCM Pressure Transducers
• Pumps
• Discrete Outputs
• Slide Valve Control
• Head Pressure Output
• VFD Speed Control
• Pumpdown/Lockout
• Terminate Lockout
• Refrigerant Type
CONTINUED
ON NEXT PAGE
CONTROL ALGORITHM STATUS
CONTROL TEST
ALARM HISTORY
List the Control Tests
List the Control Algorithm Status Tables
• CAPACITY (Capacity Control)
• OVERRIDE (Override Status)
• LL_MAINT (Lead Lag Status)
• ISM_HIST (ISM Alarm History)
• LOADSHED
• WSMCHLRE (Water System Manager)
• OCCDEFCM (Time Schedule Status)
NEXT
PREVIOUS
SELECT
EXIT
Select a Table
• NET_OPT
• BRODEF
• OCCEFCS
• HOLIDAYS
• CONSUME
• RUNTIME
(ANALOG VALUES)
(DISCRETE VALUES)
Select a Parameter
NEXT
PREVIOUS
SELECT
EXIT
Modify a Parameter
ENTER
ENABLE
DISABLE
QUIT
DECREASE
INCREASE
ENTER
QUIT
NEXT
PREVIOUS
SELECT
EXIT
Select a Table
EQUIPMENT CONFIGURATION
List the Equipment Configuration Tables
• CAPACITY (Capacity Control Algorithm)
• OVERRIDE (Override Status)
• LL_MAINT (LEADLAG Status)
• WSMDEFM2 (Water System Manager Control Status)
Maintenance Table Data
NEXT
PREVIOUS
SELECT
EXIT
Data Select Table
OCCPC01S (Local Status)
OCCPC02S (CCN, ICE BUILD Status)
OCCPC03S (CCN Status)
OCCDEFM (Time Schedule Status)
NEXT
PREVIOUS
SELECT
EXIT
Select a Test
Fig. 21 — 23XL Service Menu Structure
Содержание 23XL
Страница 18: ...18 Fig 15 Control Panel Fig 16 Power Panel ...
Страница 51: ...51 Fig 31 23XL Leak Test Procedure ...
Страница 52: ...52 Fig 32 Typical Optional Pumpout System Piping Schematic with Storage Tank TC Frame 1 and 2 Chillers ...
Страница 53: ...53 Fig 33 Typical Optional Pumpout System Piping Schematic With Storage Tank TD Frame 4 Chillers ...
Страница 54: ...54 Fig 34 Typical Optional Pumpout System Piping Schematic Without Storage Tank TC Frame 1 and 2 Chillers ...
Страница 55: ...55 Fig 35 Typical Optional Pumpout System Piping Schematic Without Storage Tank TD Frame 4 Chillers ...
Страница 99: ...99 Fig 49 Benshaw Inc Solid State Unit Mounted Starter Wiring Schematic Low Voltage ...