Assembly of the fuselage:
1.
Installation of the shafts and the motor
Put the lower part of the fuselage upside down on the table. In the two rear openings
should later sit the screws. The later hole has to be measured, cantered from left and right
and so high, that the screw is as far down as possible but not too deep, so that the screws
don´t touch the table (later the floor). This is for the safety, so that the screws do not break
in case of unintentional incorrect use! So hold the screws and adjust. Measure out the
second page.
Drill a hole with the diameter of the shaft. The hole should be slightly inclined. Now fit the
waves once. The screws must not stand out at the back, so that they do not damage the
cord when pulling out. The extension of the inner webs at the boat serve as security for
the cord.
But the screws also should not be too far inside, otherwise the feed is not optimal.
At best, the end of the rotor blades is equal to or almost equal to the end of the
inner webs.
These are stored waves that are specially made for this boat. These are already cut to
length.
In conjunction with the battery holders, the center of gravity and the subsequent water
position of the catamaran are automatically optimally defined.
First, the black mounting block is stuck in the boat. Here it is important to glue the block so
that the angle and the distance to the end of the boat are right. First of all, install the
waves on a trial basis.
It is best to let it dry overnight.
It may be that the block must be fitted slightly.
A full-surface gluing with adhesive silicone also stabilizes the boat and increases the
torsional rigidity.
Now you can mount the motor unit incl. Holder and shaft firmly and above all exactly in 90
° and the correct distance. Take your time, this is a absolutely important step.
333
Содержание XXL 2020
Страница 6: ...Screws rivets feed flap battery wave bore wave bore 6 6 6 ...
Страница 9: ...Assembly division shaft 9 9 9 ...
Страница 10: ...Mounting the hinges with 1 or 2 flaps 10 10 10 ...
Страница 11: ...Illustration Servo operation of 2 feeder flaps incl Bowden cable and battery holder 11 11 11 ...
Страница 12: ...Illustration Servo operation of 1 feed flap with Bowden cable 12 12 12 ...
Страница 15: ...Example Mounted lower shell X Jet 15 15 15 ...
Страница 18: ...18 18 18 ...
Страница 21: ...CONGRATULATIONS now everything is ready 21 21 21 ...