C220 / C300 / C400
Troubleshooting
03.22
Service Instructions
29
5.3 Pressure Measuring
NOTICE!
Use a manometer with a measuring scale to 5 bar for
measuring the pressure.
PSI
PSI
MP1
MP2
5
6
1
2
3
4
Figure 16
1. Dismantle the cover and interconnect the manometer to
measuring point 1.
Measuring point 1: Tube (3) - Connector (4).
2. Open the air supply and activate the valve manually to measure
the pressure.
3. If required adjust the pressure at throttle valve 'support air' (1).
4. Mount the cover again.
1. Dismantle the cover.
2. Cover the suction plate at the pad hermetically.
3. Interconnect the manometer to measuring point 2.
Measuring point 2: Tube (5) - Connecter (6) at vacuum generator.
4. Open the air supply and activate the valve manually to measure
the pressure.
5. If required adjust the pressure at throttle valve 'vacuum' (2).
6. Mount the cover again.
CAUTION!
Malfunction at label takeover from the dispensing edge to
the pad.
Not enough vacuum / air de support.
After the pressure measuring reconnect all
connectors and check the interference fit of the tubes.
Measuring point 1:
Support air (reference
value 2.0 bar)
Measuring point 2:
Vacuum (reference
value -0.6 bar)
Содержание C220
Страница 1: ......
Страница 4: ...Table of Contents C220 C300 C400 4 Service Instructions 03 22 ...
Страница 8: ...Introduction C220 C300 C400 8 Service Instructions 03 22 ...
Страница 16: ...Product Description C220 C300 C400 16 Service Instructions 03 22 ...
Страница 26: ......
Страница 32: ...Troubleshooting C220 C300 C400 32 Service Instructions 03 22 ...
Страница 34: ...Block Diagram C220 C300 C400 34 Service Instructions 03 22 ...
Страница 36: ...Pneumatic plan C220 C300 C400 36 Service Instructions 03 22 ...
Страница 38: ...Terminal Diagram of PCB C220 C300 C400 38 Service Instructions 03 22 Figure 20 ...
Страница 40: ...Environmentally Friendly Disposal C220 C300 C400 40 Service Instructions 03 22 ...
Страница 43: ......
Страница 44: ......