1
N
M
PT F FC FA
4
2
3
Pa
ge
7
-
M
anu
al
FA
012
42
-E
N
- 0
8/
20
18 - © C
AM
E S
.p
.A
. - T
he c
on
te
nt
s o
f t
hi
s m
anu
al m
ay c
ha
ng
e, a
t a
ny t
im
e, a
nd wi
th
ou
t n
ot
ic
e.
-
Or
igin
al
in
st
ru
ct
io
ns
Preparing the barrier
Remove the two screws on the top dome
,
fit the key into the lock and turn it counter clockwise
.
Lift the dome
and remove the inspection hatch
.
Left
Right
Fill the hole with earth around the concrete block.
Remove the nut and washer from the bolts
Fit the electric cables into the tubes so that they come out about 600 mm.
⚠
Warning!
The barrier is set up for installing on the left.
When installing on the right, invert the boom's opening direction, as follows:
- remove the anchoring pin from the lever arm
;
- release the gearmotor by using the key;
- turn the lever arm by 90°
;
- lock the motor again;
- fasten the anchoring pin to the opposite hole on the arm
;
- invert cables M with N and FA with FC
.
Содержание G4040IZ
Страница 25: ...G4040Z G4040IZ Street barriers EN English FA01242 EN INSTALLATION MANUAL ...
Страница 49: ...G4040Z G4040IZ Barrières routières FR Français FA01242 FR MANUEL D INSTALLATION ...
Страница 73: ...G4040Z G4040IZ Автоматические дорожные шлагбаумы RU Pусский FA01242 RU РУКОВОДСТВО ПО УСТАНОВКЕ ...