12
installation manual
2) The outdoor unit
a. Whether there is vibration or abnormal noise during
operation.
b. Whether the generated wind, noise, or condensed of by
the air conditioner have influenced your neighborhood.
c. Whether any of the refrigerant is leaked.
A protection feature prevents the air conditioner from being
activated for approximately 3 minutes when it is restarted
immediately after shut off.
CAUTION
1) The indoor unit
a. Whether the switch on the remote controller works well.
b. Whether the buttons on the remote controller works
well.
c. Whether the air flow louver moves normally.
d. Whether the room temperature is adjusted well.
e. Whether the indicator lights normally.
f. Whether the temporary buttons works well.
g. Whether the drainage is normal.
h. Whether there is vibration or abnormal noise during
operation.
I. Whether the air conditioner heats well in the case of the
HEATING/COOLING type.
4
Set the air conditioner under the mode of "COOLING" with
the remote controller, and check the following points. If there
is any malfunction, please resolve it according to the chapter
"Troubleshooting" in the "Owner's Manual".
Test operation
11. TEST OPERATION
The test operation must be carried out after the entire
installation has been completed.
Please confirm the following points before the test operation:
2
1
According to the user's requirement, install the remote
controller frame where the remote controller's signal can
reach the indoor unit smoothly.
3
The power voltage fits the rated voltage of the air
conditioner.
There is no obstacle at the outlet and inlet of the outdoor
and indoor units.
The gas-side and liquid-side stop valves are both opened.
The air conditioner is pre-heated by turning on the power.
The indoor unit and outdoor unit are installed properly.
Tubing and wiring are correctly completed.
The refrigerant pipe system is leakage-checked.
The drainage is unimpeded.
The heating insulation works well.
The ground wiring is connected correctly.
The length of the tubing and the added stow capacity of
the refrigerant have been recorded.
Connect the connective cables to the terminals as identified
with their respective mached numbers on the terminal block
of indoor and outdoor units.
Re-install the cover or the protection board.
The Specification of Power
10.2
Wiring figure
10.3
(Refer to Table10-1
~
Table 10-2)
(Refer to Fig.10-2
~
Fig.10-12)
Fig.10-1
Protection board
Cover
All the pictures in this manual are for explanation
purpose only. They may be slightly different from the air
conditioner you purchased.The actual shape shall
prevail.
NOTE
Dissemble the bolts from the cover.(If there isn't a cover on
the outdoor unit, disassemble the bolts from the maintenance
board, and pull it in the direction of the arrow to remove the
protection board.) (Refer to
Fig.9-1
)
Connect the cable
10.1
For detailed installation acceptance please refer to your
power supplier, if restrictions do apply for products like
washing machines, air conditioners or electrical ovens.
For power details of the air conditioner refer to the rating
plate of the product.
For any question contact your local dealer.
4
3
5
Remark per EMC Directive 2004/108/EC.
For to prevent flicker impressions during the start of the
compressor (technical process) ,following installation
conditions do apply.
NOTE
The power connection for the air conditioner has to be
done at the main power distribution. The distribution has
to be of a low impedance, normally the required
impedance reaches at a 32 A fusing point.
No other equipment has to be connected with this power
line.
1