
5
INSTALLATION
It is imperative that this unit is installed and operated with the designed airflow and electrical supply in
accordance with this manual. If there are any questions about any items, please call the service
department at
1-866-784-6900
for warranty and technical support issues.
Mechanical
WARNING: DO NOT RAISE UNIT BY THE INTAKE HOOD, BLOWER, MOTOR SHAFT, OR
BEARINGS. USE ALL LIFTING LUGS PROVIDED WITH A SPREADER BAR OR SLING UNDER THE
UNIT.
Figure 1 - Spreader Bar
Site Preparation
1. Provide clearance around installation site to safely rig and
lift equipment into its final position (
). Supports
must adequately support equipment. Refer to
manufacturer’s estimated weights.
2. Locate unit close to the space it will serve to reduce long,
twisted duct runs.
3. Consider general service and installation space when
locating unit.
4. Do not allow air intake to face prevailing winds. Support
unit above ground or at roof level high enough to prevent
precipitation from being drawn into its inlet. The inlet must
also be located at least 10 feet away from any exhaust
vents. The fan inlet shall be located in accordance with the
applicable building code provisions for ventilation air.
Clearance
The top, back, and front surfaces of this heater may not be installed less than 6” from combustible
materials. The heater base may be installed on combustible surfaces. Allow 24” minimum service
clearance on both sides of this heater.
Spreader
Bar
Lifting Lugs
Lifting Lugs
Содержание D76
Страница 2: ...2...
Страница 43: ...43 Notes...