Precautions during construction
□
Follow the instructions and be sure that all the specified screws and bolts for assembly are tightened securely
□
Tighten the M8 bolts about 13Nm (130kgfcm) tightening torque.
□
Do not use anything other than the specified parts or accessory parts.
□
The foundation should comply with the certified engineering specifications
page
4
.
□
Allow sufficient curing time for the concrete and do not place heavy objects on it or subject it to vibrations during
curing
.
□
Caution
note below to prevent aluminum materials corrode.
sea
sand
cement
enhancer
water-
reducing
cryopro
tectant
(1) Do not use sea sand for the foundation since it contains
salt and may cause corrosion. Do not use a cement
enhancer, water-reducing agent or cryoprotectant.
They may cause the posts to corrode.
(2) Immediately wipe off any mortar or stains from the surface
of the aluminum parts as they may cause corrosion.
Electric drill
Ratchet wrench, Adjustable wrench
Measure, Level, Plumb bob
Concrete
(
Cement, Aggregate,etc
)
S
ilicon
, Caulk gun, pallet
Grinder
Please prepare tools and materials as
required
Necessary Tools and Materials for Installation
aluminium type
SLC
Sun Silver
UC
Urban Gray
COLOUR SELECTION