background image

APPROVED

 BY:

DATE

PROJECT

REVIEWED

DESIGNED

DRAWN

CLIENT

B

A

C

D

E

F

G

H

J

K

1

2

3

4

5

6

7

8

1

2

3

7

8

B

A

C

D

E

F

G

H

J

K

COPYRIGHT STRUCTERRE

 CONSULTING ENGINEERS:

 THESE DRAWINGS

 ARE SOLE

 PROPERTY OF

 STRUCTERRE CONSULTING

 ENGINEERS AND

 MAY NOT

 BE USED

 IN WHOLE

 OR IN

 PART WITHOUT

 WRITTEN OR

 FORMAL PERMISSION

 FROM STRUCTERRE

 CONSULTING ENGINEERS

.

SHEET

PROJECT

 No

.

SCALE

REV

BY

ISSUE

 /

 REVISION

 DESCRIPTION

DATE

SIZE

A3

STRUCTERRE

 CONSULTING

 ENGINEERS

 (VIC)

 Pty

 Ltd

 (ABN

 32

 155

 811

 957)

www

.structerre

.com

.au

RUSSELL

 WHITE

BRIAN

 NASR

OCT

 2018

RUSSELL

 WHITE

116216

0

RUW

ISSUE

 FOR

 APPROVAL

11

.10

.18

CANTAPORT

GROUND

 FLOOR

, BUILDING

 2

, 630

 MITCHAM

 ROAD

, MITCHAM

 VIC

. 3132

TEL

 (03)

 8872

 6999

   FAX

 (03)

 9873

 2777

   EMAIL:

 melbourne@structerre

.com

.au

NTS

S103

SUREFOOT

 OPTION

SLAB

 &

 SLAB

 

REINFORCEMENT

 BY

 

OTHERS

.

DAMP-PROOF

 MEMBRANE

 TYPICAL

PACKING

 SAND

SUREFOOT

S500

 MIN

COLUMN

 

FULLY

 WELD

 COLUMNS

 TO

 16mm

 

BASEPLATE

. PROVIDE

 6xM16

 

BOLTS

.

NOTES:

1.

 PINS

 MUST

 HIT

 REFUSAL

, ROCK

 OR

 

EXTEND

 MIN

 1200mm

 INTO

 NATURAL

 

OCCURRING

 CLAY

.

2.

 MIN

 PIN

 LENGTH

 OF

 2000mm

 (12x

 

PINS

 REQUIRED

 MIN

.)

3.

 HOLES

 MAY

 NEED

 TO

 BE

 PREDRILLED

 

WHEN

 ENCOUNTERING

 ROCK

, REFER

 TO

 

SUREFOOT

 RECOMMENDATIONS

.

COLUMN

 TO

 BE

 FULLY

 WELDED

 TO

 800

 x 

400

 x

 25mm

 THICK

 BASE

 PLATE

.  BOLT

 

TO

 FOOTING

 VIA

 6No

.  

M16

 MEDIUM

 

DUTY

 CHEMICAL

 ANCHORS

. DRILL

 HOLE

 

DEPTH

 TO

 BE

 MIN

 200mm

.

FP1 =

 1000 MIN

600

 x

 1500

 MIN

300

NOTE:

 

1.

 LENGTH

 OF

 FOOTING

 TO

 BE

 IN

 DIRECTION

 OF

 RAFTER

 PROJECTION

.

2.

 CONCRETE

 FOOTING

 TO

 BE

 FOUNDED

 INTO

 MIN

 300mm

 OF

 NATURAL

UNDISTURBED

 MATERIAL

, TO

 BE

 CONFIRMED

 BY

 THE

 BUILDER

3.

 ALTERNATIVELY

 CAST

 COLUMN

 FULLY

 INTO

 FOOTING

, 100mm

 FROM

 BASE

.

PROVIDE

 2x

 R12

 RODS

 300mm

 LONG

 CENTRAL

 TO

 EACH

 POST

.

COLUMN

 TO

 BE

 FULLY

 WELDED

 TO

 800

 x 

400

 x

 25mm

 THICK

 BASE

 PLATE

.  BOLT

 

TO

 FOOTING

 VIA

 6No

.  

M16

 MEDIUM

 

DUTY

 CHEMICAL

 ANCHORS

. DRILL

 HOLE

 

DEPTH

 TO

 BE

 MIN

 200mm

.

FP1 =

 1000 MIN

1000

 x

 1000

 MIN

300

NOTE:

 

1.

 CONCRETE

 FOOTING

 TO

 BE

 FOUNDED

 INTO

 MIN

 300mm

 OF

 NATURAL

UNDISTURBED

 MATERIAL

, TO

 BE

 CONFIRMED

 BY

 THE

 BUILDER

2.

 ALTERNATIVELY

 CAST

 COLUMN

 FULLY

 INTO

 FOOTING

, 100mm

 FROM

 BASE

.

PROVIDE

 2x

 R12

 RODS

 300mm

 LONG

 CENTRAL

 TO

 EACH

 POST

.

Содержание Assembly Instructions

Страница 1: ...allation Manual Thank you very much for choosing our company s Cantaport products Please be sure to thoroughly read these instructions for assembling the Cantaport product in conjunction with the engi...

Страница 2: ...below to prevent aluminum materials corrode sea sand cement enhancer water reducing cryopro tectant 1 Do not use sea sand for the foundation since it contains salt and may cause corrosion Do not use a...

Страница 3: ...imension Position of Posts and Base Dimension Dimension Position of Post Single D24 D27 D30 Wide D48 D54 D60 Length Dimension W Height Dimension H and Post Standard Position post could be changed as t...

Страница 4: ...elding wire net are arranged in concrete floor Dimension of projection which prevents floating at 4 rounds is more than 50mm 50mm Distance A from outside edge of base to around concrete floor is more...

Страница 5: ...shaped gutter 5 parts U shaped gutter 3 parts U shaped gutter 5 parts U shaped gutter 3 parts type Single Wide body size Depth D Length W standard post long post post main frame component parts type...

Страница 6: ...ts post cap post set R single post front frame side post gutter side post connecting parts post set L single post set L single hexagon bolt with washer spring washer M8 25 post front frame side post g...

Страница 7: ...be sure to return to the owner notice small truss screw 5 10 10 post ornament ornament bracket flat head screw 4 12 8 flat head screw 4 12 8 drilling screw 4 10 8 arm arm set wide arm hexagon nut M8...

Страница 8: ...main frame Right Left each 2 pcs Right Left each 2 pcs roof rafter set single gutter front frame set single gutter front frame set wide main frame set anchor rod arm hanging bracket arm holder back p...

Страница 9: ...frame cap single gutter cap single gutter cap wide arm cap side frame fixing bracket cap post ornament cap front frame cap wide content name quantity Parts ID shape content name quantity Parts ID shap...

Страница 10: ...polycarbonate mat panel When mark is CP it is the heat protection polycarbonate panel When mark is CF it is the heat protection FRP panel drilling screw elbow drain elbow saddle glue caution label sno...

Страница 11: ...ont frame Installation of the main frame Installation of the roof rafter Fixing the side frame Installation of the roof panels Installation of the roof retainer Attaching the round gutter parts post m...

Страница 12: ...of the connecting parts is upper side U shaped gutter U shaped up Fix the post fixing bracket with small truss screw 5 10 10 note note Fix the all hexagon bolts and fasten completely because this par...

Страница 13: ...post ornament cover Install the opposite side in the same way step2 Insert the post caps on the top and screw it with the flat head screw 4 12 8 drilling screw 4 10 8 post ornament set post set flat h...

Страница 14: ...the arm side The figure indicates right side step4 Insert the anchor rod into the post hole anchor step5 support stand plumb bob Insert post into the base hole and fix with support stand not to fall...

Страница 15: ...right left Install it as below figure The higher side is gutter side Fix the arm holder and the side frame fixing brackets as below front frame side front frame side gutter side gutter side note hexag...

Страница 16: ...side frame fixing bracket under has right left Install it as below figure Detailed figure of the silicon part indicates the silicon part hexagon bolt M10 25 parts box hexagon bolt M10 95 30 parts box...

Страница 17: ...side gutter side parts box small truss screw 5 10 10 parts box small truss screw 5 10 10 side frame side frame front frame side frame After connecting each frames with small truss screws as figure In...

Страница 18: ...Single Wide Single Wide Installation for Single is 3 screws For Wide is 4 screws 2 screws on top face and other 2 screws on down face step1 step2 Attach the roof panel cushions on the top side of all...

Страница 19: ...gonal dimension of roof Put the roof rafter into the front frame and screw it with driling screws 4 10 8 B part B part detail U shaped gutter U shaped gutter At A part screw it to guide hole At B part...

Страница 20: ...will run idle Holder part of the side frame after making 5 hole on the top face of the fin make 3 hole on the second fin Put the caps onto the side frame fixing bracket under After making 3 hole to th...

Страница 21: ...se the panel color may change by sunlight The panel width has two size when D24 30 48 54 60 the wider panel width 703mm put at both ends and the smaller one width 575mm put at midspan In only case of...

Страница 22: ...truss screw 4 10 7 parts set front frame cap silicon If the screws of retainer middle part tighten too much the screw will run idle tightening torque less than15kgf cm If the screw head leans when in...

Страница 23: ...of rain gutter Installation of gutter hole cap Detailed figure of the silicon part Be sure to do sealing work around screws in order to prevent danger when cleaning as well as for water proof silicon...

Страница 24: ...2018 RUSSELL WHITE 116216 0 RUW ISSUE FOR APPROVAL 11 10 18 CANTAPORT GROUND FLOOR BUILDING 2 630 MITCHAM ROAD MITCHAM VIC 3132 TEL 03 8872 6999 FAX 03 9873 2777 EMAIL melbourne structerre com au CAN...

Страница 25: ...GS TO SUIT EXPOSURE CLASSIFICATION f ALL WORK GENERALLY TO BUILDING CODE OF AUSTRALIA AND ALL RELEVANT BUILDING STANDARDS AND CODES g ALL SCREWS SIZES AS PER DETAILS COATING TO SUIT EXPOSURE CLASSIFIC...

Страница 26: ...ANTAPORT ARCHITECTURAL DRAWINGS FOR PURLIN TYPE DE5934 T5 56 5 22 1 5 T 1 5mm min 2 REFER TO CANTAPORT ARCHITECTURAL DRAWINGS FOR ARM TYPE DE5913 T5 60 T 3 5mm min REFER TO CANTAPORT ARCHITECTURAL DRA...

Страница 27: ...S 1 PINS MUST HIT REFUSAL ROCK OR EXTEND MIN 1200mm INTO NATURAL OCCURRING CLAY 2 MIN PIN LENGTH OF 2000mm 12x PINS REQUIRED MIN 3 HOLES MAY NEED TO BE PREDRILLED WHEN ENCOUNTERING ROCK REFER TO SUREF...

Отзывы:

Похожие инструкции для Assembly Instructions