A message appears that indicates that the installation has started.
NOTE:
After confirming the LED activity starts and the LED display shows the cyclic codes (C1 > C2 > C3 > C1...), turn off the printer
using the main power switch on the front.
Once the installation is complete, the
imagePRESS Server
will shut down automatically.
13. Flip both of the
imagePRESS Server
service switches to the Normal (OFF) position.
2
1
Figure 32: Flipping the
imagePRESS Server
service switches
No.
Name
1
Flip the service switches from Service (ON) position...
2
...to Normal mode (OFF) position.
14. Disconnect the Ethernet cable from the
imagePRESS Server
network port and the Windows computer.
15. Reconnect all the cables that were connected to the
imagePRESS Server
.
4. INSTALLING SYSTEM SOFTWARE
66
Содержание imagePRESS Server G250 V2
Страница 7: ...Introduction 1 Introduction 2 Specifications 7 ...
Страница 16: ...Using the imagePRESS Server 2 Using the imagePRESS Server 11 ...
Страница 20: ...REPLACING PARTS 3 Replacing Parts 15 ...
Страница 52: ...INSTALLING SYSTEM SOFTWARE 4 Installing System Software 47 ...
Страница 74: ...TROUBLESHOOTI NG 5 Troubleshooting 69 ...
Страница 86: ...INSTALLATION PROCEDURE 6 Before Connection 81 Installation Procedure 83 Settings After Installation 91 ...
Страница 94: ...9 10 11 2x 1x 12 1x Cross Ethernet Cable 1x 6 INSTALLATION PROCEDURE 88 ...