COPYRIGHT © 1998 CANON INC. CANON DADF-A1 REV.0 DEC. 1998 PRINTED IN JAPAN (IMPRIME AU JAPON)
iv
CHAPTER 3 MECHANICAL SYSTEM
CHAPTER 4 MAINTENANCE AND SERVICING
I.
BASIC CONSTRUCITON ........... 3-1
A. External Covers ..................... 3-1
B. Switches ................................ 3-3
C. Adjusting the DADF Height
............................................... 3-5
II.
DRIVE SYSTEM ........................ 3-6
A. Removing the Pick-Up
Motor Unit .............................. 3-6
B. Removing the Feeder Motor Unit
............................................... 3-6
C. Belt Motor .............................. 3-7
D. Removing the Clutch Unit
............................................... 3-9
E. Delivery Motor ..................... 3-10
III.
FEEDING SYSTEM .................. 3-11
A. Pick-Up Roller ..................... 3-11
B. Removing the Separation
Belt Unit ............................... 3-12
C. Feeding Roller Unit ............. 3-12
D. Registration Roller ............... 3-14
E. Delivery/Resersing Roller
............................................. 3-16
F. Delivery Roller Unit
(bottom Pick-up Mode) ......... 3-20
G. Delviery Roller Unit
(top Pick-up Mode)............... 3-20
H. Reversing Guide .................. 3-22
I. Stopper Plate Solenoid ........ 3-24
J. Positioning the Paper Retaining
Plate Solenoid (SL2) ........... 3-24
K. Positioning the Paper Deflecting
Solenoid (SL3) ..................... 3-26
L. Stamp Solenoid ................... 3-26
M. Feeding Belt ........................ 3-28
IV.
CLEANING ............................... 3-30
A. Belt Assembly ...................... 3-30
B. Sensors ............................... 3-30
C. Separation Flapper .............. 3-33
D. Separation Guide................. 3-33
V.
FEEDING ................................. 3-34
A. Pick-Up Drive Assembly ...... 3-34
B. Right Delivery Drive
Assembly ............................. 3-34
I.
PERIODICALLY REPLACED
PARTS ........................................ 4-1
II.
CONSUMABLES AND
DURABLES ................................ 4-1
III.
SCHEDULED SERVICING
CHART ....................................... 4-2