C&M 24 Скачать руководство пользователя страница 10

10

6

P

V

P

Fig. 12

Making the Electrical Connections

Hinge down the electrical box to gain access to the electrical connections. Push in the tabs (Fig 12) on either side of the
boiler and pivot the box forward.

Connect the main cable to live, neutral and earth. 

If using a room thermostat or other external control :

Undo the two retaining screws , remove cover and remove cable clamp. (right side) (Fig. 13)
Remove connector from the PCB in the cover
Connect the external control cable in place of the link on the multipin plug C
Reconnect multipin plug into the socket on the printed circuit board. Secure the cable using the cable clamp and 
replace the cover.

Note: The connections should be made so that should the lead be pulled from its anchorage, the current carrying wires
become taut before the earth wire

TR

COM

REP

8

M/A

VITESSE

1

1

1

1

1

1

BUS

1

CALYDRA

OFF ON

11

12

2

1.23

OFF ON

11

12

1

SW2

PROG

SW1

TA

1

T2A

1

MCD

1

230V

MOTEUR

RL6

R133

C28

T15

R36

R35

C80

C79

T16

R34

T12

T11

R107

R33

R130

R129

D43

U9

Z7A

R132

R16

R15

R14

C84

C83

R6a

Z4A

C78

RL13

C73

Z6

R7a

Z7

Z4

D46

T10

T9

RL8

RL7A

RL7

RL10

RL2A

RL2

RL9

R119

R118

R113

R9 R8

R7

R6

R31

R32

R29

R27

R25

R24

R23

R19

R18

R17

R140

R137

TH4

R13

R12

R11

R115

C82

C81

T14

T13

R136

TH3

U11

R64

R10

R63

R59

R128

R112

J9

J6

J7

J4

J3

J2

J1

F1

D5

D31

D30

D32

D42

D41

D40

D35

D36A

D36

D17

D16

D15

D14

J11

C34

J5

C52

C51

C75

C74

C31

C38

C27

C26

C25

C1

J12

U12

+5V

RL1

J1

Ph

N

RACC

TA

+

+

+

230 V

Fig. 13

J

S

N

230V

PH

THERMOSTAT

R. ACC

Mains

1

2

S

connector 

C

Socket for
connector 

C

M

Electrical Connections

7

Pre-commissioning

Ensure that the system has been adequately flushed.
Purge gas supply of air and test for soundness.
Carry out final electrical tests to ensure the correct polarity and
earthing continuity.

DHW

Open the main cold feed valve 40.
Open all hot taps to purge DHW system.
Check for water soundness.
Check flow rate at the bath tap is set correctly (see technical data).
Central Heating
Open flow and return valves on the boiler 37 and 41 (Fig. 14)
Open the automatic air vent 18 (Fig. 2)
Fill system and vent radiators.
Set system pressure and remove filling loop.
Check for leaks.
Manually check pump is free to turn.
Switch on electrical supply.
Press the Central Heating switch 29 (Fig. 3) to switch on heating
mode. 
Press the +

key

32 (Fig. 3) to set heating temperature to maximum.

Allow pump to run for several minutes.

Isolate the electrical supply.
Drain boiler and check water filter for installation debris.
Replace filter and recharge system.
Lighting the Boiler
Inspect the  entire gas supply for soudness, including the gas meter,
the gas installation should be in accordance wiith the relevant
standards, in GB this is BS 6891 and in IE this is the current edition
of I.S.813.
Connect gas pressure gauge to test point 39 (Fig. 14).
Turn on the gas supply and boiler gas tap 39 (Fig. 14).
Ensure electrical supply is on.
Ensure all external controls are calling for heat.
Press on Central Heating switch 29 (Fig. 3) to switch on heating
mode. 
Press the +

key

32 (Fig. 3) to set heating temperature to maximum.

The boiler will light. Allow the boiler to heat system.
Check the inlet gas pressure (working pressure) while boiler is
operating in hot water mode.(Refer to technicaldata).
Check the operation of the boiler controls and safety devices.(see
separate servicing leaflet for details).Set the by pass (refer to the
paragraph bellow).
Re-flush the system to remove any dissolved oils and fluxes.
Recharge system pressure and introduce any water treatment as
required.

Commissioning and Testing

Содержание 24

Страница 1: ...system 30 c Manufactures N Model Type Gas Council N 200905821037 31 Centora Green System 24 Nat 41 980 12 200906822037 31 Centora Green System 30 Nat 41 980 31 GB IE U n i t 3 A T h o r n t o n R o a...

Страница 2: ...ors and windows to ventilate the room Shut the gas mains tap on the gas meter or the valve of the gas cylinder and call your Gas Supplier immediately If you are going away for a long period of time re...

Страница 3: ...S 7671 and document IGE UP 7 In the Republic the Republic of Ireland the installation should be carried out in accordance with the following codes of practice I S 813 Domestic Gas Installation the fol...

Страница 4: ...T FUNCTION 21 19 TECHNICAL DATA 22 This instruction booklet is especially designed for appliances installed in the The United Kingdom and The Republic of Ireland INTRODUCTION The CENTORA GREEN SYSTEM...

Страница 5: ...at sensor 42 Silencer 1 2 3 4 5 6 8 11 12 13 14 35 30 24 34 1 INSTALLER S INSTRUCTIONS 7 Fig 1 Fig 3 15 21 10 9 Fig 2 33 36 31 32 19 18 23 16 29 24 Display 27 Setting key 28 Setting key 29 Central Hea...

Страница 6: ...m The expansion vessel is pre charged to 0 7 bar 10 lb in 2 The vessel is suitable for systems up to 145 litres capacity For systems of greater capacity an additional expansion vessel will be required...

Страница 7: ...ulphur level contained in the gas should comply with the europ an Standards which are maximum 150 mg m3 for a short period in a year average level of 30 mg m3 during one year Electrical Supply The app...

Страница 8: ...e system should be carefully checked for leaks as frequent refilling could cause premature system corrosion or unnecessary scaling of the heat exchanger The pipe from the siphon 12 fig 1 should be con...

Страница 9: ...of 5 mm If the flue is a side exit installation then calculate the position of the hole with a slope of 5 mm metre towards the boiler from the terminal The flue should rise up slightly to the terminal...

Страница 10: ...rthing continuity DHW Open the main cold feed valve 40 Open all hot taps to purge DHW system Check for water soundness Check flow rate at the bath tap is set correctly see technical data Central Heati...

Страница 11: ...available in C H mode Post Commissioning Ensure system pressure has been set correctly Set all parameters of the boilers as shown in chapter 9 ADJUSTMENTS AND SETTINGS Set boiler thermostat and contro...

Страница 12: ...eter in a section Press on setting key key on the Left side to enter in modification mode The 2nd and 3rd digits are flashing Press on or on the Right side to select the correct value then press on Se...

Страница 13: ...ersion of display PCB 0 10 to 99 Flue type 2 1 FF variable speed Room thermostat is calling for heat 3 0 no 3 1 yes Theoretical position of the 3 way valve 4 0 DHW 4 1 CH DHW flow temperature in Celsi...

Страница 14: ...min 2 1 0 min 2 5 0 min Maximum Central Heating flow temperature 4 50 C 4 80 C CH anti cycling delay 8 0 0 min From 0 to 7 minutes by step of 0 5 min 8 0 5 min 8 2 5 min 8 5 0 min CH maximum output li...

Страница 15: ...erature is displayed in celsius degrees The 3 dots indicate that the combustion rate control is ON at maximum output X X Switching off the combustion rate control mode press once press once press once...

Страница 16: ...side times The display shows 906 which corresponds to the 18 kW which is the factory setting 9 section 9 06 18 kW press on setting key on the Left side one time the 2nd and 3rd digits flash together T...

Страница 17: ...l Heating thermistor faulty open circuit 12 Central Heating thermistor faulty open circuit 18 Attempt to re light 20 Wiring problem 23 Fan speed too low 24 Fan control system defective 31 Communicatio...

Страница 18: ...nge indicator Burner ON 35 Red indicator Lock out flame failure 36 Reset button 12 Connecting bracket Taps shown in Open position fig 21 37 Central heating flow isolating valve 39 Gas service tap 41 C...

Страница 19: ...ing Press on key 29 the green indicator 30 will light and the display will show the Heating flow temperature Keys 31 and 32 allow to adjust the temperature required in the Central Heating system regar...

Страница 20: ...and the burner will start 13 15 The manufacturer s guarantee is for 12 months from the date of purchase The guarantee is voidable if the appliance is not installed in accordance with the recommendati...

Страница 21: ...system and rise up the system pressure chapter 8 Close the heating flow isolating valve Don t forget to open it again when you will start heating Gas Conversion Incorrect Operation Helpful suggestions...

Страница 22: ...0 87 m3 h 31 ft3 h 1 m3 h 35 ft3 h Gas valve restrictor diameter without without Propane L P G G31 Gas rate C H max 1 94 kg h 36 ft3 h 2 21 kg h 41 ft3 h Gas rate C H mini 0 64 kg h 12 ft3 h 0 73 kg h...

Страница 23: ...23 U n i t 3 A T h o r n t o n R o a d I n d E s t a t e O f f H o c k n e y R o a d B r a d f o r d B D 8 9 H Q 0 1 2 7 4 4 8 8 3 8 8 w w w h e a t i n g s p a r e s 2 4 7 c o m...

Страница 24: ...ited MTS Building Hughenden Avenue High Wycombe Bucks HP13 5FT Telephone 01494 755600 Fax 01494 459775 Internet www chaffoteaux co uk E mail info uk mtsgroup com Technical Support Help Line 0870 241 8...

Отзывы: