V. Optional Gas Collection System Installation 

(tubing kit PN 15028596)

 

 

TEL Series Models with ‘G’ in the product suffix (i.e. TEL12-105FNSG) include a gas collection system 
feature which allows the hydrogen and oxygen gases that may vent from the battery to be directed to a 
specific cabinet exit location by the installation of 6mm or ¼” ID PVC tubing. This tubing daisy chains 
from one battery to the next in the string with the first battery in the string requiring a ‘plug’ in the hose 
barb port above the positive terminal 
of the battery (shown in Figure 6).  
(Note that each battery ships with a 
plug in this right side port.  Installer 
should remove any remaining plugs 
to allow for tubing connection) 
Individual tubes are cut by the 
installer (each short tubing piece is 
approx 6” in length) and are routed 
from battery to battery as shown in 
Figure 6 (please make sure that the 
tubing is not kinked so gases can flow 
freely in the tubing).  A final system 
collection tube, which varies in 
length, is connected to the hose barb 
port above the negative terminal on 
the left most battery unit. This tube should be routed per the cabinet manufacturer’s instructions.    

 

Special Note: if the gas collection system is not required and/or utilized, the factory installed 
plug in the right port of each 12 volt battery can be removed or can remain in place. NEVER 
install a plug in both battery ports or the left side port since this will not allow the battery to vent 
any excess pressure and could cause an unsafe condition. 

    

VI. Freshening Charge 

When the batteries have been in storage or transit for an extended period, over 6 months or if OCV’s are 
below 12.48 volts or when the number of cells in series is greater than 24, it is recommended the battery 
system be given a freshening charge at 2.4 volts average per cell for 24 hours prior to final installation. 
This will ensure higher initial performance and will reduce the time period required for the cells to achieve 
proper voltage balance between the individual units. Normally freshening charges are only necessary if batteries 
were in a warehouse at 77°F in excess of 6 months or the open circuit voltage of the unit has declined to less than 
12.48 VDC.  
 
Additionally, if the batteries are being deployed into a system having a string voltage greater than 48Vdc, 
C&D strongly recommends the entire string be given a 2.4 volts average per cell charge prior to 
installation. This will ensure the closest possible voltage balance between the individual units in the 
string. 

 

VII. Float Charging  

Following the freshening charge (if necessary) the battery system should be placed on “float“ charge at 
between 2.25 volts per cell and 2.30 volts per cell average (approximately 13.5 to 13.8 volts/unit average 
for 12 volt units at 77°F). When temperatures other than 77°F (25°C) temperature compensated charging 
may be needed. 

 

 

 

 

Refer to technical bulletin 41-2128 “Charging Valve Regulated Lead Acid Batteries” for additional 

information www/cdtechno.com/resource/support_doc.html 

 

 

 

Plug 

Short tubes 

Tube to 
cabinet 
exit port 

Figure 6 – Optional Gas Collection 
System Installation (if required by 
cabinet manufacturer) 

RS02046/0514/CD 

 

 

 

 

 

 

 

www.cdtechno.com 

Содержание TEL12-105FNSG

Страница 1: ...rmation www cdtechno com Technical Warranty Assistance contact C D Technologies Inc 1400 Union Meeting Road PO Box 3053 Blue Bell PA 19422 0858 800 543 8630 or 215 619 2700 Fax 215 619 7899 Before han...

Страница 2: ...TEL12 170F FG 1 15028593 8mm x 16 1 15028594 2 15028591 15028595 15028596 1 15028538 TEL12 180F 1 30046800 20 x 3 4 1 15029218 2 15029217 N A N A 1 15028506 TEL12 190F FG 1 15028593 8mm x 16 1 1 15028...

Страница 3: ...trolyte which contains dilute sulfuric acid this is harmful to the skin and eyes is electrically conductive and is corrosive If electrolyte contacts the skin wash immediately and thoroughly If electro...

Страница 4: ...ohm meter ohmic test set 100 amp momentary load test set or system load bank Typically for Telecom applications four individual batteries are connected in series to form a higher voltage string of ba...

Страница 5: ...e terminal to battery 2 s positive terminal as shown in Figure 4 Tighten bolt washer assembly hand tight Step 5 Repeat using the provided inter unit bus bar and hardware bolt and washer connect betwee...

Страница 6: ...gative terminal to String A battery 2 s positive terminal as shown in Figure 5 Tighten bolt washer assembly hand tight Step 6 Torque each of the above bolt washer assemblies as per the inch pound spec...

Страница 7: ...unsafe condition VI Freshening Charge When the batteries have been in storage or transit for an extended period over 6 months or if OCV s are below 12 48 volts or when the number of cells in series i...

Страница 8: ...vent the free flow of gases thru the exit point Semiannual Inspection Repeat the quarterly checks Record the on charge voltage of each unit Optionally perform and record Ohmic checks for trending purp...

Отзывы: