UPDATE SUMMARY
UPDATE SUMMARY
This summary highlights updates to the Predelivery Inspection for MY2014. It does not supersede pro-
cedures detailed further in this publication.
IMPORTANT:
Technicians should read and apply all procedures in this PDI bulletin as applicable to model.
APPLICABLE TO
UPDATE DESCRIPTION
REFERENCE
Battery removal for charging moved
PARTS AND SUB-CRATES
REMOVAL
Parts stored in different compartments for
shipping
PARTS CHECK
Vehicle uncrating sequence modified
UNCRATING
Front cargo module installation sequence
additions, modifications and sequence changes
PARTS TO BE INSTALLED
NEW radiator protector removal added
PARTS TO BE INSTALLED
NEW Engine air inlet duct connection added
PARTS TO BE INSTALLED
Body parts installation sequence additions and
modifications. Also divided into smaller topics
PARTS TO BE INSTALLED
Front fenders installation additions
PARTS TO BE INSTALLED
Rear turn signal lights installation
(Japan models)
PARTS TO BE INSTALLED
New shift sequence decal SM6 and SE6
(Japan models)
PARTS TO BE INSTALLED
NEW engine oil level verification procedure
FLUIDS
NEW recommended engine coolant
FLUIDS
Front tire pressure change
SETUP
New meter setup for drive belt tension
SETUP
Addition of procedure for setting cluster
language
SETUP
New remote horizontal adjuster, high beam
headlights (Japan models)
SETUP
All RT Models
Specifications pages removed, available on BOSSWeb or INFO CENTER
PREDELIVERY
2014-1
3 / 52