![Camus Hydronics DRW1000 Скачать руководство пользователя страница 43](http://html1.mh-extra.com/html/camus-hydronics/drw1000/drw1000_installation-and-service-manual_490912043.webp)
43
Adjust staging of boilers
Description
Electrical Connection(s)
Programming Instructions
•
Upon a call for heat the lead
boiler will fire up to the
specified base load rate
(80%). If the temperature is
not within Error threshold
(5
o
F) of setpoint after
Interstage delay (2 minutes)
a lag boiler will be brought
online and will also fire up to
the base load rate specified.
•
This method will then be
repeated for the next lag
boiler, if available.
1)
Press
and
2)
Press
[Lead Lag Master Configuration]
3)
Press
[Advanced Settings >]
4)
Press the to arrive at
Add Stage
5)
Select
Error threshold
6)
Select
Interstage delay
Содержание DRW1000
Страница 2: ...99 0171 REV 0 9...
Страница 35: ...35...
Страница 48: ...48...
Страница 67: ...67 PART 12 EXPLODED VIEW 19 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 20...
Страница 68: ...68 21 22 23 24 26 35 34 33 32 31 30 29 28 27 25 36 37 38 39 40 42 43 56...
Страница 75: ...75 PART 13 ELECTRICAL DIAGRAMS...
Страница 76: ...76...
Страница 77: ...77...
Страница 78: ...78...
Страница 79: ...79...