![Camus Hydronics DRW1000 Скачать руководство пользователя страница 36](http://html1.mh-extra.com/html/camus-hydronics/drw1000/drw1000_installation-and-service-manual_490912036.webp)
36
DR(H,W) Lead Lag Operation
Master Boiler
Description
Electrical Connection(s)
Programming Instructions
•
Master boiler lead lag setup
1)
Place toggle switch to
LOCAL
2)
Press
and
3)
Select
System Identification & Access
4)
Verify
MB1 Modbus address
= 1
5)
Verify
MB2 Modbus address
= 1
6)
Select
Lead Lag Master Configuration
7)
Select
Master Enabled = Enabled
Fixed Setpoint operation
8)
Enter
CH
Setpoint
(Fixed setpoint)
4-20mA/ 0-10Vdc setpoint operation
9)
Select
[Advanced Settings >]
10)
Press the to arrive at
Central Heat
11)
Select
Setpoint Source = S2 (J8-6) 4-20mA
12)
Select
4mA water temperature
13)
Select
20mA water temperature
Содержание DRW1000
Страница 2: ...99 0171 REV 0 9...
Страница 35: ...35...
Страница 48: ...48...
Страница 67: ...67 PART 12 EXPLODED VIEW 19 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 20...
Страница 68: ...68 21 22 23 24 26 35 34 33 32 31 30 29 28 27 25 36 37 38 39 40 42 43 56...
Страница 75: ...75 PART 13 ELECTRICAL DIAGRAMS...
Страница 76: ...76...
Страница 77: ...77...
Страница 78: ...78...
Страница 79: ...79...