![Camus Hydronics DRW1000 Скачать руководство пользователя страница 32](http://html1.mh-extra.com/html/camus-hydronics/drw1000/drw1000_installation-and-service-manual_490912032.webp)
32
4-20mA/ 2-10Vdc Setpoint Operation (Standalone)
Description
Electrical Connection(s)
Programming Instructions
•
Boiler operates with variable
setpoint determined by 4-
20mA incoming signal
•
Modulates on boiler inlet
sensor (default)
•
Heat demand is generated
when Remote Operator is
closed and 4-20mA or 2-
10Vdc signal is present.
1)
Place toggle switch in
LOCAL
2)
Press
and
3)
Press
[CH – Central Heat Configuration]
4)
Press the to arrive at
Setpoint
5)
Select
Setpoint Source = S2 (J8-6) 4-20mA
6)
Select
4mA water temperature
7)
Select
20mA water temperature
8)
Place toggle switch to
REMOTE
for remote operation (if required)
Содержание DRW1000
Страница 2: ...99 0171 REV 0 9...
Страница 35: ...35...
Страница 48: ...48...
Страница 67: ...67 PART 12 EXPLODED VIEW 19 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 20...
Страница 68: ...68 21 22 23 24 26 35 34 33 32 31 30 29 28 27 25 36 37 38 39 40 42 43 56...
Страница 75: ...75 PART 13 ELECTRICAL DIAGRAMS...
Страница 76: ...76...
Страница 77: ...77...
Страница 78: ...78...
Страница 79: ...79...