i
Contents
PDF viewers: These page numbers refer to the printed version of this document. Use the
PDF reader bookmarks tab for links to specific sections.
Introduction ................................................................ 1
Precautions and Tips ................................................. 2
Quick Start ................................................................. 3
Connecting Power ................................................................................ 4
Solar Panel .................................................................................... 5
AC/DC Power ............................................................................... 5
Hook Up Power to Datalogger ............................................................. 8
Turn On the Charging Source .............................................................. 8
Turn On Power to the Datalogger ........................................................ 8
Specifications ............................................................ 9
Charging Sources ............................................................................... 10
Operational Overview .............................................. 11
Charging Details ...................................................... 13
Charging Algorithm ........................................................................... 13
Maximum Power Point Tracking ....................................................... 13
A100 Null Modem Adapter....................................... 14
A105 Additional 12 V Terminals Adapter ............... 16
References ............................................................... 16
Figures
The PS150 connected to a CR1000 and AC power .............................. 3
The PS150 connected to a CR1000 and solar panel ............................. 4
CH150 connected to BP24 battery pack and CR1000 ......................... 4
Solar panel connections on PS150 ....................................................... 5
AC power connections on PS150 ......................................................... 6
Lift latch up on PS150 ......................................................................... 7
Wiring harness plugged into battery connector .................................... 8
5-1. PS150/CH150 Schematic ……………………………………………12
6-1.
70 W solar panel I – V and power characteristics .............................. 14
Null modem connections ................................................................... 14
Installing the A100 ............................................................................. 15
7-3. A100 mounting screw ………………………………………………..15
8-1.
Содержание CH150
Страница 1: ...PS150 CH150 12 V Charging Regulators Revision 20 6 19 Copyright 2000 2019 Campbell Scientific ...
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 8: ......
Страница 10: ...ii ...
Страница 25: ...User Manual 15 Figure 7 2 Installing the A100 Figure 7 3 A100 mounting screw Screw ...
Страница 27: ...User Manual 17 ...