background image

215

295

Page 

6

 - Manual 

FA00993-EN

 - 12/2018 - © C

AME S.p.A. - 

Tr

anslation of the original instructions

GENERAL INSTALLATION INDICATIONS

 Before working on the control panel, cut off the mains power supply and remove any batteries.

Cable types and minimum thicknesses

INSTALLING

Fastening the control panel

 Fasten the control panel in a protected area using suitable screws and dowels.

 Only use 6 x 70 mm cylinder-head screws.

 Drill through the pre-drilled holes (18 and 20 mm) under the control panel's base.

⚠ 

Be careful not to damage the control board.

 Enter the cable gland with the corrugated tubes for threading the electrical cables.

Connection

cable length

< 20 m

20 < 30 m

Control board power supply 230 V AC (1P+N)

2G x 1.5 mm

2

2G x 2.5 mm

2

Gearmotor 24 V AC

2G x 1.5 mm

2

2G x 2.5 mm

2

TX Photocells

2 x 0.5 mm

2

RX photocells

4 x 0.5 mm

2

Accessories

2 x 0.5 mm

2

Command and control devices

2 x 0.5 mm

2

 When operating at 230 V and outdoors, use H05RN-F-type cables that are 60245 IEC 57 (IEC) compliant; 

whereas indoors, use H05VV-F-type cables that are 60227 IEC 53 (IEC) compliant. For power supplies up to 
48 V, you can use FROR 20-22 II-type cables that comply with EN 50267-2-1 (CEI).
Use RG58 cable up to 10 m long to connect the antenna.

If cable lengths differ from those specified in the table, establish the cable sections depending on the 

actual power draw of the connected devices and according to the provisions of regulation CEI EN 60204-1.

 For multiple, sequential loads along the same line, the dimensions on the table need to be recalculated 

according to the actual power draw and distances. For connecting products that are not contemplated in this 
manual, see the literature accompanying said products

Содержание ZL22N

Страница 1: ...CONTROL PANEL FOR 24 V GEARMOTORS ZL22N INSTALLATION MANUAL EN English FA00993 EN...

Страница 2: ...e operator with direct jets of water sprinklers water cleaners etc Make sure the anchoring spot is clear of any potential impacts that the anchoring surfaces are solid and that elements suitable for t...

Страница 3: ...sers Fit in plain sight the machine s ID plate when the installation is complete If the power supply cable is damaged it must be immediately replaced by the manufacturer or by an authorized technical...

Страница 4: ...use The ZL22N control panel was designed for controlling 24 V UNIPARK parking saver barriers Any installation and or use other than that specified in this manual is forbidden Technical data Type ZL22N...

Страница 5: ...ing 6 Button for programming 7 Terminal board for connecting the accessories 8 Terminal board for connecting the gearmotor 9 Terminal board for connecting control and safety devices 10 Terminal board...

Страница 6: ...x 1 5 mm 2 2G x 2 5 mm 2 TX Photocells 2 x 0 5 mm 2 RX photocells 4 x 0 5 mm 2 Accessories 2 x 0 5 mm 2 Command and control devices 2 x 0 5 mm 2 When operating at 230 V and outdoors use H05RN F type...

Страница 7: ...e to rotate Assemble the pressure hinges Fit the hinges into the box either on the right or left and fasten them using the supplied screws and washers Snap the cover onto the hinges Close it and secur...

Страница 8: ...e original instructions Input voltage 1 Power supply cable with double insulation 230 V AC 50 60 Hz 2 Accessories 24 V AC max 25 W power supply output 3 Control board power supply input Radio control...

Страница 9: ...onds from mode 1 to mode 2 the red LED flashes twice from mode 2 to mode 1 the red LED flashes once Each time the board is switched on if it is in mode 1 the red LED remains off if it is in mode 2 the...

Страница 10: ...RX TX RX TX Page 10 Manual FA00993 EN 12 2018 CAME S p A Translation of the original instructions if not used Safety devices Photocells Input for photocells or magnetic loop Reopening during closing W...

Страница 11: ...993 EN 12 2018 CAME S p A Translation of the original instructions The motor current consumption is proportional to the parking saver power Amperometric sensor sensitivity adjustment Sensitivity DIP s...

Страница 12: ...tor Before fitting the AF board you MUST CUT OFF THE MAIN POWER SUPPLY and remove any emergency batteries Adding a user If one or more LM22N boards are connected to the control panel it is not possibl...

Страница 13: ...gth flashes about 4 seconds and quick flashes about 2 seconds until it it switches off Reset DIP switch 4 to OFF Deleting a single user Set DIP switch 4 to ON Keep pressed the PROG button on the contr...

Страница 14: ...ld be disposed of as solid household waste and simply separated from other waste for recycling Whereas other components control boards batteries transmitters and so on may contain hazardous pollutants...

Страница 15: ...Page 15 Manual FA00993 EN 12 2018 CAME S p A Translation of the original instructions...

Страница 16: ...CAME S p A Via Martiri Della Libert 15 31030 Dosson di Casier Treviso Italy tel 39 0422 4940 fax 39 0422 4941 Page 16 Manual FA00993 PL 12 2018 CAME S p A Translation of the original instructions...

Отзывы: