background image

CALIFORNIA ACCENT LIGHTING, INC.

2820 E. Gretta Lane, Anaheim, CA 92806
ph. 800.921.CALI (2254) | fx. 714.535.7902 | [email protected] | calilighting.com

© CALI. All rights reserved. CALI reserves the right to make changes or withdraw specifications without prior notice.

5 / 20 / 2021 / Rev 3

Page 9 of 11

ALS

500T-DBR-HC

INSTALLATION INSTRUCTIONS

Installing Reflective Film (ALS500T-DBR-RF-98)

Installation Area

Reflective Film

Puller Stand

One person installs Reflective Film
according to the instructions below.

Another person feeds film from
puller stand to installer, ensuring
that film is not disturbed in the process.

Installers must wear gloves

First, insert esge of film into
the gap between the lens and
extrusion. Do not allow film to
cover lens.

Second, reeat process for
other side of extrusion.
Ensure the arc of the film
is consistent throughout
the entire run.

Lens

1

2

Extrusion

Miter Square

Reflective Film

Rough edge

Location of new cut

Clean edge

Cut a 1’ section of Reflective Film and practice installing to get a feeling for how 
it bends and forms in the luminaire. The film cannot be corrected if it is bent, 
folded, wrinkled, or kinked during installation.

1

Place roll of Reflective Film onto wire puller stand. Gently pull film from roll 
and feed to installer as needed. Check that the textured side is facing downward 
when pulling.

3

Place beginning edge all the way to the end, so the edge of the film sits flush to 
the end cap.

4

At the end of the run, estimate how much more film will be needed. Make small 
cuts at the end of the film and test fit it. Repeat if necessary until the film meets 
the end cap flush.

5

Check along entire run that Reflective Film is installed correctly. Ensure lens is 
not covered by film and that it is securely tucked into each edge along the run.

6

If applicable, cut the end of the sheet so it has a smooth and even edge.

Tip:

 Use a tool to ensure an accurate cut.

2

• Follow the below diagrams and steps if applicable to your installation.
• Only install Reflective Film after all other installation requirements are
   complete. Lighting must be tested and in working order, and wall must be
   mudded, painted, and completely dry before beginning. 
• Reflective Film requires a minimum of two people to ensure a secure and
   correct installation.
• Use a puller stand to prevent damage to the film while installing.
• Installers must wear gloves while handling Reflective Film.
• The Reflective Film is two-sided. Place the textured side facing downward.
   The smooth side should only be facing upward.

INSTALLATION GUIDELINES

• Stable in humid environments
• Anti-static
• Abrasion resistant
• Continuous thermal stability up to 100°C
• Compatible with the following cleaning solutions: dilute ammonia, soap
   solutions, Clorox Wipes, Pine-Sol, and Formula 409

FEATURES & MAINTENANCE

SPECIFICATIONS

REFLECTANCE @ 550

NM

97.5 ± 0.8% (ASTM E1164)

L* VALUE

> 98.9 (ASTM E308)

A VALUE

-0.35 ± 0.25 (ASTM E308)

B VALUE

0.90 ± 0.30 (ASTM E308)

GLOSS (60°)

< 5.0% (ASTM D2456)

THICKNESS

205 µm ± 15 (Ono Sokki EG225)

TENSILE STRENGTH

165 MPa (ASTM D882)

DEFORMATION TEMPERATURE

130°C (JIS K7196-1991)

MELT TEMPERATURE

255°C (ASTM D3418)

UL RELATIVE THERMAL INDEX

105°C (UL746)

Содержание alumLEDs ALS500T-DBR-HC

Страница 1: ...ing 24 Volts DC for easy and safe installation Long life energy efficient LEDs Available in 4 Watts up to 24 Watts Per Foot Can be ordered to specific lengths for when exact dimensions are known Examp...

Страница 2: ...o Power Source Circuit 2H White Circuit 1H Gray KEY A Standard Length Luminaire runs are constructed in 8 segments B Custom Length Any required length that is not 8 Typically the last segment of a run...

Страница 3: ...to make changes or withdraw specifications without prior notice 5 20 2021 Rev 3 Page 3 of 11 ALS500T DBR HC INSTALLATION INSTRUCTIONS Diagram of Assembly Aircraft Cable Hard Ceiling Hard Ceiling Trim...

Страница 4: ...such as drywall or plywood 4 Secure Aircraft Cable Assemblies to mounting surface The top of the assembly should rest approximately 7 above ceiling line Ensure assembly is centered between the T Bars...

Страница 5: ...ct vary Always confirm wiring diagram from driver installation instructions before connecting 17 If applicable install mud in end cap at end of run The mud in end cap is used when the end of the lumin...

Страница 6: ...5 Aircraft Cable Assembly 4 ALS500T DBR 6 8 Aircraft Cable Assembly 4 For luminaires 1 5 long use 2 Aircraft Cable Assemblies per luminaire Install each assembly about 4 from each end of luminaire No...

Страница 7: ...lade for cutting metal Note If applicable remove Connector Blocks from extrusion before cutting 1 Position luminaires together and align the screw of the Male Block to meet the Female Block Tighten Al...

Страница 8: ...ween trim and fixtures not aligned Install Trim Retention Springs to ceiling trim Use one clip per 2 or two clips per segment under 4 Install clips 4 from each edge evenly spaced 3 Measure and cut a 2...

Страница 9: ...ate how much more film will be needed Make small cuts at the end of the film and test fit it Repeat if necessary until the film meets the end cap flush 5 Check along entire run that Reflective Film is...

Страница 10: ...ath is formed between the positive and negative wires the multimeter will beep flash or read 0 ohms Troubleshoot to identify the malfunction in the line If there is no conductive path the multimeter w...

Страница 11: ...ctory for any malfunctions Do not attempt to repair Only use alumLEDs with specified rated voltages Do not exceed the specified voltage for any alumLEDs luminaire Do not use alumLEDs extrusion as a ra...

Отзывы: