SR
-SERIES
12
7.0
PRE-INSTALLATION INSPECTION:
Refer to pages 13 to
Error! Bookmark not defined.
for packaging contents.
Inspect the shipping container and heater for any evidence of shipping damage. If heater damage is found,
notify freight carrier and file a claim.
WARNING:
IF HEATER IS DAMAGED, DO NOT INSTALL
Check that all parts and pieces are present and accounted for. Report any missing items to carrier or point of
purchase at once.
Check that overall general appearance, source of fuel required and model numbers match unit requested.
Report any discrepancy to carrier or point of purchase at once.
THOROUGHLY INSPECT THE EQUIPMENT
IMMEDIATELY UPON ARRIVAL
OUR RESPONSIBILITY FOR THIS SHIPMENT CEASED WHEN THE CARRIER SIGNED THE WAYBILL.
If goods are received short or in damaged condition, it is important that you notify the carrier and insist on a
notation of the loss or damage across the face of the freight bill; otherwise no claim can be enforced against
the transportation company.
If concealed loss or damage is discovered, notify your carrier at once and request an inspection. This is
absolutely necessary. A concealed damage report must be made within 15-days of delivery of shipment. Unless
you do this, the carrier will not entertain any claim for loss or damage. The Agent will make an Inspection and
grant a concealed damage notation. If you give the Transportation Company a clear receipt for goods that have
been damaged or lost in transit, you do so at your own risk and expense.
WE ARE WILLING TO ASSIST YOU IN EVERY POSSIBLE MANNER TO COLLECT CLAIMS FOR LOSS OR DAMAGE,
BUT THIS WILLINGNESS ON OUR PART DOES NOT MAKE US RESPONSIBLE FOR COLLECTION OF CLAIMS OR
REPLACEMENT OF MATERIAL. THE ACTUAL FILING AND PROCESSING OF THE CLAIM IS YOUR RESPONSIBILITY.
WE ARE NOT RESPONSIBLE FOR FREIGHT DAMAGED IN TRANSIT!
IF CONTENTS ARE DAMAGED:
EVEN THOUGH CARTON DOES NOT LOOK DAMAGED:
A. MAKE CLAIM TO DELIVERY CARRIER AT ONCE
B. SAVE CARTONS FOR INSPECTION BY CARRIER
Содержание SR Series
Страница 17: ...SR SERIES 13 8 0 PACKAGING CONTENTS DESCRIPTION OF PARTS BURNER PACKAGE Figure 10 BURNER PACKAGE CONTENTS...
Страница 18: ...SR SERIES 14 PIPE BOXES Figure 11 PIPE BOX CONTENT...
Страница 19: ...SR SERIES 15 10 3 M REFLECTOR PACKAGE Figure 12 10 3 M REFLECTOR PACKAGE CONTENTS...
Страница 20: ...SR SERIES 16 15 4 16 M REFLECTOR PACKAGE Figure 13 15 4 16 M REFLECTOR PACKAGE CONTENTS...
Страница 21: ...SR SERIES 17 20 6 1 M REFLECTOR PACKAGE Figure 14 20 6 1 M REFLECTOR PACKAGE CONTENTS...
Страница 22: ...SR SERIES 18 30 9 1 M REFLECTOR PACKAGE Figure 15 30 9 1 M REFLECTOR PACKAGE CONTENTS...
Страница 23: ...SR SERIES 19 40 12 2 M REFLECTOR PACKAGE Figure 16 40 12 2 M REFLECTOR PACKAGE CONTENTS...
Страница 24: ...SR SERIES 20 50 15 2 M REFLECTOR PACKAGE Figure 17 50 15 2 M REFLECTOR PACKAGE CONTENTS...
Страница 25: ...SR SERIES 21 60 18 3 M REFLECTOR PACKAGE Figure 18 60 18 3 M REFLECTOR PACKAGE CONTENTS...
Страница 26: ...SR SERIES 22 70 21 3 M REFLECTOR PACKAGE Figure 19 70 21 3 M REFLECTOR PACKAGE CONTENTS...
Страница 27: ...SR SERIES 23 80 24 4 M REFLECTOR PACKAGE Figure 20 80 24 4 M REFLECTOR PACKAGE CONTENTS...
Страница 28: ...SR SERIES 24 10 3 M EXTENSION KIT Figure 21 10 3 M EXTENSION PACKAGE CONTENTS...
Страница 29: ...SR SERIES 25 SIDE REFLECTOR PACKAGE Figure 22 SIDE REFLECTOR PACKAGE CONTENTS...
Страница 30: ...SR SERIES 26 90 ELBOW PACKAGE Figure 23 90 ELBOW PACKAGE 180 U BEND PACKAGE Figure 24 180 U BEND PACKAGE...
Страница 34: ...SR SERIES 30 HORIZONTAL INSTALLATION 10 3 M REFLECTOR PACKAGE Figure 28 HORIZONTAL INSTALLATION 10 3 M PACKAGE...
Страница 56: ...SR SERIES 52 SIDE REFLECTOR Figure 52 SIDE REFLECTOR INSTALLATION...
Страница 62: ...SR SERIES 58 ROOF EXHAUST Single Unit Use B style chimney SINGLE UNIT INTO ONE 1 B Vent Chimney...
Страница 78: ...SR SERIES 74 24 0 GAS VALVES Figure 62 GAS VALVE Figure 63 PRESSURE REGULATOR...
Страница 94: ...SR SERIES 90...
Страница 95: ...SR SERIES 91...