ENCORE GROUND Rev. 1 2021-10
www.cafection.com 800-561-6162
26
SERVICE & INSTALLATION MANUAL for Cafection's Encore Ground
4.11 Chute Kit Installation (Optional)
1. Open the brewer's door and remove the front pannel.
2. Insert the chute base inside the chute hole of the cabinet.
3. Insert the waste chute into the chute base.
4. Install the front panel by aligning its metal bracket with the metal bracket fixed on the brew
group assembly.
See Annex 4 for the chute base hole positioning diagram.
In
it
ia
l S
e
tu
p
Front panel
Waste chute
Chute base