EN1805CMINSA Rev. 5 2021-10
www.cafection.com 800-561-6162
16
SERVICE & INSTALLATION MANUAL - Encore 29
4
INITIAL SETUP
Before installing the brewer at the desired location, it is strongly suggested to unpack, inspect and perform
a bench test of the machine at the warehouse.
4.1
On-Site Installation Requirements
4.1.1 Operating Environment
Equipment is for indoor use only.
4.1.2 Power Supply
Make sure each unit has its own electrical circuit and is located within five (5) feet of the
dedicated electrical outlet.
Use only a polarized grounded receptacle.
Domestic 120V AC / 60Hz - 15A circuit. NEMA 5-15 outlet.
4.1.3 Water Supply
Use a plastic 1/4” or 3/8” (outside diameter) dedicated line branched off a larger line.
An easily accessible shut off valve upstream of the unit is highly recommended for ease
of installation. Make sure that your installation complies with your federal, state, provincial
and/or municipal codes.
Cold tap water pressure should be at least 20 psi and no more than 80 psi.
Do not use distilled water.
The Encore 29 is NSF/ANSI 4 certified. For your installation to comply with
NSF/ANSI 4 standards, a backflow protection meeting applicable federal, state,
provincial and local regulations must be installed on the water inlet.
4.1.4 Tools Required
- Adjustable wrench
- Level indicator
Other tools may be required depending on the type of water supply tubing and
location.
In
it
ia
l S
e
tu
p