background image

Operation Manual 

EID-2 Optical Impression Device 

December 26, 2006 

 

Table of Contents 

Chapter 1:  Introduction .......................................................................................................... 7

 

Overview ................................................................................................................................ 7

 

The Digital Crown Production Process ................................................................................... 7

 

About the iTero Service .......................................................................................................... 8

 

Chapter 2:  Operating Instructions ......................................................................................... 9

 

First Time Usage .................................................................................................................... 9

 

Booting System ...................................................................................................................... 9

 

Shutting Down System ........................................................................................................... 9

 

Unplugging System for Short Intervals.................................................................................... 9

 

Automatic Shutdown............................................................................................................... 9

 

Using the iTero Software .......................................................................................................10

 

Using the Handheld Scanner.................................................................................................10

 

Disinfecting Scanner and Replacing Disposable Sleeve ........................................................11

 

Using the Foot Pedal Unit......................................................................................................12

 

Chapter 3:  Cart Features .......................................................................................................13

 

Front View of Cart .................................................................................................................13

 

Back View of Cart..................................................................................................................14

 

Main Power Shut Off For Shipping or Storage .......................................................................14

 

Restoring Power after Shipping or Storage............................................................................14

 

Cleaning Monitor ...................................................................................................................15

 

Locking Wheels .....................................................................................................................16

 

Appendix A:  Hardware Specifications..................................................................................17

 

 

Содержание iTero EID-2

Страница 1: ...evice Operation Manual Optical Impression System for Computer Assisted Design and Manufacturing 510K exempt under 21 CFR 872 3661 DIGITAL IMPRESSION DEVICE iTero Mobile Cart Publication SD08300 A Revi...

Страница 2: ...em or transmitted in any manner electronic or mechanical for any purpose other than the customer s normal usage without the prior written permission of Cadent TRADEMARKS Cadent OrthoCAD iTero EID 1 EI...

Страница 3: ...040 10 and EN 60825 1 MEDICAL SAFETY COMPLIANCE This equipment complies with the medical safety standard UL 60601 FCC Compliance This device complies with part 15 of FCC Rules and operation is subject...

Страница 4: ...ELESS LAN The EID 2 system comes equipped with a Wireless LAN unit Using standard wired communications will violate the AC mains power isolation SCANNER The scanner emits red laser light for performin...

Страница 5: ...tting Down System 9 Unplugging System for Short Intervals 9 Automatic Shutdown 9 Using the iTero Software 10 Using the Handheld Scanner 10 Disinfecting Scanner and Replacing Disposable Sleeve 11 Using...

Страница 6: ...EID 2 Optical Impression Device Operation Manual 6 Publication SD08300 A Rev 1 05 This page is intentionally blank...

Страница 7: ...erform Digital Scan Perform tooth preparation in conventional fashion Then use the EID 2 system to perform a high resolution digital scan of the tooth Upon completion of the scanning process place a t...

Страница 8: ...akes it possible to perform an intra oral digital scan in the office and to produce a precise crown based on the digitally acquired data iTero provides important advantages over existing crown product...

Страница 9: ...es and applications 2 Press the front POWER switch 3 MS Windows shuts down PC turns off and green POWER LED goes off Unplugging System for Short Intervals Follow these instructions if you need to unpl...

Страница 10: ...ation press F1 to activate the iTero OFFICE help The iTero Case Manager works interactively with iTero OFFICE and handles file communications between the doctor s office and the Cadent Center For more...

Страница 11: ...oceed with the steps below in order to replace the disposable sleeve STEP 1 Press firmly on both sides of the disposable sleeve to release STEP 2 Pull the disposable sleeve slowly off the scanner arm...

Страница 12: ...dialog in the iTero OFFICE application right is green left is red LED INDICATOR Pressing either foot pedal turns on the green LED The battery needs to be replaced if any of the following events occur...

Страница 13: ...reely in any direction Optical scanner for capturing teeth images Note that the handheld scanner may be placed in scanner cradle in either direction right to left or left to right POWER switch for per...

Страница 14: ...ug power cable from the wall socket 4 Press the MAIN POWER SHUT OFF switch on the back of the cart to remove power from all internal components Restoring Power after Shipping or Storage To restore pow...

Страница 15: ...y dampen a clean white cotton cloth with water and wipe monitor clean 3 Dry the monitor immediately using a clean white cotton cloth 4 If further cleaning is necessary use a clean cloth to wipe off th...

Страница 16: ...n Device Operation Manual 16 Publication SD08300 A Rev 1 05 Locking Wheels Each of the four wheels can be locked or unlocked individually LOCK WHEEL UNLOCK WHEEL Step down on lever to lock wheel Raise...

Страница 17: ...roduced by D LINK The DWL G122 provides 2 4 GHz communications using the 802 11g standard for wireless connectivity Foot Pedal Battery 3V Lithium coin battery type CR2450 or CR2477 Mouse Optical wirel...

Отзывы: