3.2.3 CLOSE TO UTILITY SOURCE SIDE
Before proceeding, verify the position of the switch by
observing the position of manual operation handle in
Figure 3.1. If the handle is UP, the contacts are closed
in the UTILITY (NORMAL) position, no further action
is required. If the handle is DOWN, proceed with Step
1.
Step 1: With the handle inserted into the moveable
contact carrier arm, move handle UP. Be
sure to hold on to the handle as it will move
quickly after the center of travel.
Step 2: Remove manual operating handle from move-
able contact carrier arm. Return handle to
storage bracket.
3.2.4 CLOSE TO GENERATOR SOURCE SIDE
Before proceeding, verify the position of the switch
by observing the position of the manual operation
handle in Figure 3.1. If the handle is DOWN, the
contacts are closed in the GENERATOR (STANDBY)
position. No further action is required. If the handle
is UP, proceed with Step 1.
Step 1: With the handle inserted into the moveable
contact carrier arm, move the handle DOWN.
Be sure to hold on to the handle as it will
move quickly after the center of travel.
Step 2: Remove manual operating handle from move-
able contact carrier arm. Return handle to
storage bracket.
3.2.5 RETURN TO UTILITY SOURCE SIDE
Step 1: Manually actuate switch to return manual
operating handle to the UP position.
Step 2: Remove manual operating handle from move-
able contact carrier arm. Return handle to
storage bracket.
3.3 VOLTAGE
CHECKS
1. Turn ON the UTILITY power supply to the
PowerManager LTS using the UTILITY SERVICE
DISCONNECT circuit breaker.
DANGER
PROCEED WITH CAUTION. THE TRANSFER SWITCH
IS NOW ELECTRICALLY HOT. CONTACT WITH LIVE
TERMINALS RESULTS IN EXTREMELY HAZARDOUS
AND POSSIBLY FATAL ELECTRICAL SHOCK.
2.
With an accurate AC voltmeter, check for correct
voltage. Measure across ATS terminal lugs N1
and N2. Also check N1 to NEUTRAL and N2 to
NEUTRAL.
3. When certain that UTILITY supply voltage is correct
and compatible with transfer switch ratings, turn
OFF the UTILITY supply to the transfer switch.
4.
On the generator panel, set the AUTO/OFF/
MANUAL switch to MANUAL position. The gen-
erator should crank and start.
Section 3 — Operation
RTSS Type Transfer Switch
Move handle UP for the
non-essential loads OFF.
Move handle DOWN for the
non-essential loads ON.
Attach handle to the moveable
contact carrier arm.
NOTE:
Return handle to storage position in enclosure when finished with manual transfer.
Figure 3.2 — Actuating LSS Transfer Switch
Содержание 8kW
Страница 1: ...Study Guide S e r v i c e T r a i n i n g Air Cooled Training...
Страница 2: ......
Страница 36: ...32 32 Section 7 Notes Air cooled Generators...
Страница 37: ...33 Section 8 Installation Diagrams Air cooled Generators Circuit Breakers Drawing No 0G8573 A...
Страница 38: ...34 Section 8 Installation Diagrams Air cooled Generators Generator Drawing No 0G8280 D...
Страница 39: ...35 Section 8 Installation Diagrams Air cooled Generators Generator Drawing No 0G8280 D...
Страница 42: ...Part No 0G8334 Revision D 09 16 08 Printed in U S A Catalog No OMASPCA S 01...
Страница 43: ...TECHNICAL MANUAL This manual should remain with the unit RTSS Load Shed Automatic Transfer Switch...
Страница 54: ...10 Section 4 Installation Diagrams RTSS Type Transfer Switch Load Shed Interconnection Drawing No 0G8774 B...
Страница 55: ...11 Section 4 Installation Diagrams RTSS Type Transfer Switch 200 Amp Load Shed Enclosure Drawing No 0G8775 B...
Страница 56: ...12 Section 5 Electrical Data RTSS Type Transfer Switch Electrical Schematic Drawing No 0G7816 A...
Страница 57: ...13 Section 5 Electrical Data RTSS Type Transfer Switch Electrical Schematic Drawing No 0G7816 A...
Страница 58: ...14 Section 5 Electrical Data RTSS Type Transfer Switch Wiring Diagram Drawing No 0G7817 B...
Страница 59: ...15 Section 5 Electrical Data RTSS Type Transfer Switch Wiring Diagram Drawing No 0G7817 B...
Страница 64: ...20 Section 7 Notes...
Страница 65: ...21 Section 7 Notes...
Страница 66: ...Part No 0G8637 Revision D 08 27 08 Catalog No KGALT 1SI Printed in U S A...
Страница 68: ......
Страница 76: ...8 Residential Transfer Switch Installation Guide Installation Drawing 0H0258 A...
Страница 77: ...9 Residential Transfer Switch Installation Guide Installation Drawing 0H0258 A...
Страница 78: ...Residential Transfer Switch Installation Guide Installation Drawing 0G8573 A 10 10...
Страница 79: ...11 Residential Transfer Switch Installation Guide Electrical Schematic Drawing 0G7959 A...
Страница 80: ...12 Residential Transfer Switch Installation Guide Wiring Diagram Drawing 0G7958 A...
Страница 81: ...13 Residential Transfer Switch Installation Guide Wiring Diagram Drawing 0G7958 A...
Страница 82: ...14 Residential Transfer Switch Installation Guide Load Center Exploded View Drawing 0G8786 C...
Страница 84: ...16 Residential Transfer Switch Installation Guide Notes...
Страница 85: ...17 Residential Transfer Switch Installation Guide Notes...
Страница 86: ...Part No 0G8571 Revision D 07 31 08 Catalog No KGATX100 1SI Printed in U S A...
Страница 91: ...5 REFERENCE Items supplied in the EZ Transfer operator kit...
Страница 92: ...6...
Страница 93: ...7...
Страница 95: ...Air cooled Generator Battery Charger Installation Guidelines...
Страница 105: ...9 Section 5 Interconnection Diagrams Battery Charger Installation Guidelines RTSS Diagram Drawing No 0G8774 B...
Страница 106: ...10 Section 5 Interconnection Diagrams Battery Charger Installation Guidelines RTSN Diagram Option 1 Drawing No 0G8832 A...
Страница 107: ...11 Section 5 Interconnection Diagrams Battery Charger Installation Guidelines RTSN Diagram Option 2 Drawing No 0G8832 A...
Страница 108: ...12 Section 5 Interconnection Diagrams Battery Charger Installation Guidelines RTSE Diagram Option 1 Drawing No 0G8829 A...
Страница 109: ...13 Section 5 Interconnection Diagrams Battery Charger Installation Guidelines RTSE Diagram Option 2 Drawing No 0G8829 A...
Страница 110: ...14 Section 5 Interconnection Diagrams Battery Charger Installation Guidelines GenReady Diagram Drawing No 0G4744 D...
Страница 111: ...15 Section 5 Interconnection Diagrams Battery Charger Installation Guidelines GenReady Diagram Drawing No 0G4744 D...
Страница 112: ...16 Section 5 Interconnection Diagrams Battery Charger Installation Guidelines GenReady Diagram Drawing No 0G4744 D...
Страница 113: ...17 Section 6 Notes Battery Charger Installation Guidelines...
Страница 114: ...Part No 0G7956 Revision B 11 14 08 Printed in U S A...
Страница 115: ......