If you have attached everything correctly the
connections should look like the image on the
right side.
Step 2: Check that the power lead is no longer
then +/- 10 cm removed from the Rubber tule
relieve. Use your feeling to make sure that the
power lead does not roll-up in the compartment.
You can gently pull on the power lead on the
inside of the wall until satisfied. See the second
image on the right for a reference.
Step 3: Fasten the Climate control set loosely by
using 2 hexagon cap screws like on the image
below.
Don’t fasten the screws to tight as this may harm
the cables or circuit board!
+/- 10CM
Содержание Pro
Страница 1: ...Installation manual Cabinaid Pro...