![C2Dx T/PUMP TP700 Скачать руководство пользователя страница 20](http://html1.mh-extra.com/html/c2dx/t-pump-tp700/t-pump-tp700_maintenance-manual_3132274020.webp)
Signature:
Functional checks (Continued)
Complete all the functional tests for the
T/Pump
®
Temperature Therapy Pump
. If the pump passes all the requirements
of this functional check and safety inspection, the pump should be considered operational and suitable to return to
service.
Functional check setup -
Clik-Tite
®
connectors
Note:
If the flow meter is connected in reverse, the flow meter will indicate no flow. Reverse the pump connections so
that the male fitting (with black O-ring) is on the supply side.
A
B
C
D
E
Figure 1: Functional check setup for
Clik-Tite
®
connectors
1. Plug into a properly grounded outlet (A) (
Figure 1 on page 16
).
2. Fitting and tube closest to the front of the
T/Pump
®
Temperature Therapy Pump
(B).
3. Male
Clik-Tite
®
connectors
(black O-ring) (C).
4. Mul-T-Pad
®
Temperature Therapy Pad
, size 18” or 22”: lay the pad flat and at the same level as the pump (D).
5. TPT9
, 7 gph (26.5 lph) minimum. Read at top of the float (E).
Functional check setup - Colder connection
Note:
If the flow meter is connected in reverse, the flow meter will indicate no flow. Reverse the pump hose connections
to change the direction of the flow.
101176 Rev 1
Preventive maintenance
16
c2dx.com
Содержание T/PUMP TP700
Страница 2: ......
Страница 4: ......
Страница 12: ...8 Serial number location A Introduction 101176 Rev 1 c2dx com...
Страница 33: ...101176 Rev 1 T Pump Temperature Therapy Pump assembly 29 c2dx com...
Страница 34: ...101176 Rev 1 T Pump Temperature Therapy Pump assembly 30 c2dx com...
Страница 38: ......
Страница 39: ...C2Dx Inc 555 East Eliza Street Ste A Schoolcraft MI 49087 USA www c2dx com 101176 Rev 1 2021 10 Rev 1...