background image

Battery Box Premium HV Combiner Box

 

Installation Manual V1.

1

22 

10. Contact Information

BYD Global Service 

[email protected] 

Social media link 

Telephone: +86 755 89888888-47175 

https://www.facebook.com/BatteryBoxBYD/ 

Address:No.3009,BYD Road, 

Pingshan,Shenzhen,518118,P.R.China 

www.bydbatterybox.com 

https://twitter.com/BYD_BatteryBox   

https://www.linkedin.com/company/byd-battery-box 

Australia 

Alps Power Pty Ltd 

service @alpspower.com.au 

Telephone: +61 2 8005 6688 Address: 

14/47-51 Lorraine St Peakhurst NSW 

221 

www.alpspower.com.au 

Europe 

EFT-Systems GmbH   

[email protected] 

Telephone 

+49 9352 8523999 

+44 (0) 2037695998(UK) 

+34 91 060 22 67(ES) 

+39 02 873683(IT) 

Address: Bruchtannenstraße 28, 63801 

Kleinostheim, Germany 

www.eft-systems.de 

South 

Africa 

AFRIPLUS ENERGY GROUP (PTY) LTD 

USA 

BYD US service 

[email protected] 

[email protected] 

Telephone: +27 21 140 3594 

Telephone: +1(833) 338-8721 

Address: The Pavilion, Corner of Dock 

& Portswood Road, V&A 

WATERFRONT, 8001, CAPE TOWN 

BYD Smart Device Hungary Kft.

Содержание Battery-Box Premium HV Combiner Box

Страница 1: ...Battery Box Premium HV Combiner Box Installation Manual Model CBH 40A V1 1 BYD Smart Device Hungary Kft...

Страница 2: ...es under some statutes and thus the above exclusion may not apply This document does not replace and is not intended to replace any local state provincial federal or national laws regulations or codes...

Страница 3: ...Wall Mounting 11 5 1 1 Selecting the Mounting Location 11 5 1 2 Mounting the Combiner Box 11 6 Electrical Connection 13 6 1 Connection Instructions 13 6 1 1 Preliminary Checks 13 6 1 2 Safety during...

Страница 4: ...um HV Combiner Box Installation Manual V1 1 4 8 Decommissioning 19 8 1 Disassembling the Combiner Box 19 8 2 Disposing of the Combiner Box 19 9 Technical Data 20 10 Contact Information 22 BYD Smart De...

Страница 5: ...all safety instructions Training in dealing with the hazards associated with the installation and operation of electrical equipment and batteries Training in the installation and commissioning of elec...

Страница 6: ...since they provide important information on safe use and maintenance BYD may make technical changes in this manual and to the product at any time without notice In case of typing errors or other types...

Страница 7: ...ive covers must always be mounted Danger to life from electric shock due to live DC cables Touching live DC cables from batteries or an inverter results in death or serious injury Prior to connecting...

Страница 8: ...mage Contact your distributor if the scope of delivery is incomplete or damaged Figure 1 Component included in the scope of delivery A Battery Box Premium HV Combiner Box CBH 40A B Installation Manual...

Страница 9: ...wer cable and grounding cable from the battery tower Number 1 4 2 Type Label There is one type label attached to the Combiner Box The type label is located on the left upside of the Combiner Box You w...

Страница 10: ...lectrical voltage WEEE designation Do not dispose of the system together with the household waste but in accordance with the disposal regulations for electronic waste applicable at the installation si...

Страница 11: ...nclosure is not mounted in the path of rainwater Requirements for mounting o Mount the Combiner Box in such a way that the connection area is facing downwards o The recommended height of the wall box...

Страница 12: ...Procedure 1 Mark the position of the drill holes on the wall or stand 2 Drill holes at the marked positions 3 If necessary insert the screw anchors 4 Fasten the Combiner Box to the wall or stand usin...

Страница 13: ...er Box is firmly anchored to walls and stable supports There are no remaining metallic parts chips and derivatives from the installation activities After performing the checks listed in the points abo...

Страница 14: ...ut from battery towers D Output DC cable glands to an inverter E Grounding cable output gland to a common ground point Danger to life due to electric shock High voltages are present in the live compon...

Страница 15: ...unding cables D Output DC cable blocks E Grounding post for output grounding cable 6 3 Leading the Cables through the Cable Glands with sealing Gasket Procedure 1 Release the cable gland 2 Lead the ca...

Страница 16: ...al cable support rail 2 Cut the cables to length and strip 25 mm off the insulation 3 If you are using bootlace ferrules mount the bootlace ferrules and crimp gas tight 4 Lead the cables to the blocks...

Страница 17: ...5 Connecting the Grounding Cable Cable requirement Conductor cross section 10 16 mm2 Outer diameter 5 mm to 12 5 mm With a ring terminal Procedure 1 Loose the original nut and washer on the ground pos...

Страница 18: ...c torque tool There are no burn marks on the terminals Yearly Visual inspection The door panel of the enclosure is firmly closed at the end of all the checks and after any maintenance Yearly Visual in...

Страница 19: ...Disassemble the Combiner Box 8 2 Disposing of the Combiner Box Dispose of the Combiner Box in accordance with the applicable disposal regulations for electronic waste Danger to life due to electric sh...

Страница 20: ...output current 40A Rated Current of the ASSEMBLY InA 40A Rated short time withstand current Icw 10kA Pollution degree 3 Fuse holder Rail Mounting 1 500 VDC Fuse type 40A 22x58 1 500 VDC gPV MECHANICA...

Страница 21: ...ring storage 10 50 Humidity 0 to 95 non condensing Altitude up to 4 000 m Note 2 DC INPUT DATA Maximum number of battery towers 3 Input cable glands entry 9 M20 1 5 with 1 input each Input connection...

Страница 22: ...y Ltd service alpspower com au Telephone 61 2 8005 6688 Address 14 47 51 Lorraine St Peakhurst NSW 221 www alpspower com au Europe EFT Systems GmbH service eft systems de Telephone 49 9352 8523999 44...

Отзывы: