PROTECTION & SAFETY
8
2021/07 - Version: C - Code : 34681
2.1.
Tools required
Step
Tools required
Assembling the axle
‐
Spirit level
‐
Set of wrenches
‐
Mallet
Mounting the motor and the
control panel
‐
Small flat head screw driver
‐
Cross-head screw driver
‐
Stripping pliers
‐
Cutting pliers
‐
Stanley knife
‐
Percussion drill and Ø 8 mm concrete drill bit
Assembling the pit wall
‐
Rivet pliers
‐
Mallet
‐
Percussion drill
‐
Measuring tape
‐
Drill, 5 mm
‐
Concrete drill bit, 13 mm
‐
Allen key, no. 5
‐
Cross-head screw driver, no. 2
Assembling the beam and
brackets
‐
Wrenches
‐
Allen keys
‐
Wood cutting tools (wooden duckboarding)
2.2.
People required
Step
Number of people
Length of time
Assembling the cover axle
2
1 hour
Installation of the motor drive system
1
1 hour
Installing the pit wall
2
1 hour
Assembling the slat cover apron
2
1 hour
Mounting the beam or brackets
2
1 hour
The lengths of time quoted do not take the time required to fill the pool into consideration, this will depend on
the flow rate of the water supply and the volume of the pool.