background image

Yearly:

l

Make sure that the vacuum system has been switched off and that
it cannot be switched on again accidentally

If the intake is equipped with a sieve:

u

Check the sieve at the intake and clean if necessary

l

Check the measuring and safety equipment for working order

If the discharge is equipped with a sound absorber:

u

Clean the sound absorber

If the discharge is equipped with a leak-protection non-return valve:

u

Clean the leak-protection non-return valve

l

Drain the cooling liquid (see "Draining the cooling liquid")

If the cooling water line is equipped with a filter:

u

Check the filter and clean or replace if necessary

l

Check the seals and replace if necessary

l

Check the intake and discharge lines and clean or replace if neces-
sary

Every 16000 hours of operation, at the
latest after 4 years:

l

Drain the oil (see "Draining the oil")

l

Main inspection of the vacuum system (Busch)

Lock Out/ Tag out procedure

l

Stop the vacuum system with the remote control (press on STOP
button during 10s)

l

Switch off the main circuit breaker (possibility of installing a lock)

l

Press on emergency stop button

l

Switch off the customer's power supply

l

Switch off the water (inlet first, then outlet) and nitrogen quick
connections

l

Put the label or warning board "Maintenance processing" on or
next to the vacuum system

Safety Lockout procedure

l

Take off the label or warning board "Maintenance processing"

l

Check the cooling liquid and oil levels according to the chapters
"Checking the oil level" and "Checking the cooling liquid level"

l

Open the power box cover and check that the thermal relay is on
manual reset position

l

Close the cover

l

Release the emergency stop button

l

Switch on the main circuit breaker

l

Switch on the water (outlet first, then inlet) and nitrogen quick
connections

l

Make sure that the "Necessary intallation instructions" are fol-
lowed

l

Start the vacuum system with the remote control (press on START
button)

Checking the oil

Checking the oil level

l

Make sure that the vacuum pump has been switched off and that
it cannot be switched on again accidentally

l

Indication of the oil level on the various oil sight glasses

COBRA NS (DP) vacuum pump

If the oil level does not reach the target circle:

u

Top up with oil (see “Refilling oil”)

If the oil level exceeds the target circle:

u

Check the condensate drain

l

Drain the oil (see “Draining the oil”)

WY (MB) rotary lobes vacuum pump

If the oil level does not reach the target circle:

u

Top up with oil (see “Refilling oil”)

If the oil level exceeds the target circle:

u

Check the condensate drain

l

Drain the oil (see “Draining the oil”)

Filling in new oil

COBRA NS (DP) vacuum pump

l

Prepare the quantity of oil needed (see "Oil type/ quantity")

WARNING

The use of chemically contaminated or polluted oil can lead to
hazardous pump conditions which could cause personal injury.

NOTE

: The quantity of oil specified in the installation handbook is of

informative nature only. Check the oil level with the help of the various
oil sight glasses (OSG 1, OSG 2) on the vacuum system.

l

Make sure that the drain plugs have been fitted properly and that
they do not leak

CAUTION

Only fill in oil through the oil filler openning.

l

Unscrew the oil filler cap (OFP)

l

Fill in oil in to the target circle of the oil sight glasses

Oil level, pump not operating

l

Make sure that the oil level is in the target circle of the oil sight
glasses

l

Make sure that the seals of the filler cap are not damaged and that
they sit properly. Replace if necessary.

l

Screw on the filler cap again

COBRA DS 8163 A

Checking the oil

0870772605

Page 27

MAX

MIN

MAX

MIN

MAX

MIN

Содержание COBRA DS 8163 A

Страница 1: ...i Screw and Roots Vacuum Pumps COBRA DS 8163 A Standard version Busch Manufacturing Korea Ltd 189 51 Soicheon ro Majang myun Icheon si Gyunggi do 467 813 Republic of Korea 0870772605 181024 Original i...

Страница 2: ...24 Signal control mode Select LL mode EXTERN 24 Current control mode Select LL mode AUTO 25 Maintenance 26 Maintenance program 26 Daily 26 Weekly 26 Monthly 26 Yearly 27 Every 16000 hours of operatio...

Страница 3: ...VFD DP3 DP1 DP2 MB PTB COBRA DS 8163 A MB Roots WY A075 DP 1 Backing vacuum pump DP 600 C DP 2 Backing vacuum pump DP 600 C DP 3 Backing vacuum pump DP 600 C IN Inlet MB Roots WY A075 PTB Pump termin...

Страница 4: ...COBRA DS 8163 A Page 4 0870772605 ESS OUT ECO MSF PTB COBRA DS 8163 A ECO Eletrical power supply ESS Emergency stop switch MSH Main switch OUT Discharge PTB Pump terminal box...

Страница 5: ...on gas end of cylinder ECO Combined power and sensor connection EV Expansion vessel FME Flow meter nitrogen FS 1 Flow switch cooling liquid FS 2 Flow switch cooling water HE Heat exchanger IN Inlet MV...

Страница 6: ...CWC Cooling water connection CWV 2 Regulating valve cooling water ECO Electrical connection FS 3 Flow switch cooling water IN Inlet MTB Motor terminal box ODP Oil drain plug OFP Oil fill plug OSG Oil...

Страница 7: ...cer BUPS Back up power supply CWC Cooling water connection ECP Ground EOCR Electronic Over Current Relay EXB Extension board PLCM PLC module RC Remote control MAC Magnetic contactor MCP Motor Circuit...

Страница 8: ...lating valve cooling water DGR 1 Regulating valve dilution gas middle of cylinder DGR 2 Regulating valve dilution gas end of cylinder ECO Combined power and sensor connection EV Expansion vessel FME F...

Страница 9: ...essured gas is conveyed to the re spective silencers Principle of the screw vacuum pump DP The COBRA NS vacuum pumps work by the principle of screw pumps Two parallel screws 7 rotate in opposite direc...

Страница 10: ...ounted at the motor endplate The flow of the cooling water is controlled by a flow switch FS 1 If the flow is under 1 l min during a minimum time of 30 seconds then the pump stops The temperature swit...

Страница 11: ...s realised by the LCD The vacuum pump is delivered with a circuit breaker Safety Intended use DEFINITION To rule out any misunderstanding the term handling of the vacuum system covers transport storag...

Страница 12: ...TE Type 2 work includes tasks where the energized circuits are or can be measured by placing probes through suitable openings in the covers or insulators Type 3 Equipment is energized Energized circui...

Страница 13: ...l the BUSCH Semicon service team in charge of the maintenance of the pumps l Before restarting the vacuum system reactivate the FDP1 thermal relay by pressing on Reset If this does not work wait 60 se...

Страница 14: ...S 1 FS 2 Depends on alarm function set in the PLC for water flow Set at factory General Stop ie the contactors open and remove power to mo tors S Nitrogen flow to low Nitrogen flowmeter FME Depends on...

Страница 15: ...a means of adapted lifting control the slope of the vacuum system 5 The packaging material must be disposed of in accordance with local and national regulations This handbook is contained in the deli...

Страница 16: ...5 bar Approximate flow rate 0 200 l min l Make sure that the ambient conditions correspond to the protection class of the motor according to nameplate l Make sure that the vacuum system is placed on o...

Страница 17: ...bstances must be pre vented l Make sure that the intake lines are equipped with a shut off device upstream of the intake flange so that the flow of sucked gas can be stopped l Make sure that the intak...

Страница 18: ...If the direction is wrong an error message appears on the LCD reverse two connection phase poles Electrical connection The vacuum system is build with voltage from 208 to 480 Volts WARNING Risk of ele...

Страница 19: ...ll in by filler hole until cooling liquid flows by purge cap on cylin der endplate B side gearings l Stop filling in cooling liquid l Close the purge cap on cylinder endplate B side l Fill in again by...

Страница 20: ...ight glasses l Make sure that the seals of the oil filler cap are not damaged Replace them if necessary l Screw on the oil filler cap hermetically tight COBRA DS vacuum system NOTE It is easier to swi...

Страница 21: ...m system is unavoidable wait until the surface temperature has cooled down or wear protective gloves CAUTION The intensity of the noise of the vacuum system is higher within a certain area of the vacu...

Страница 22: ...vacuum system deterioration by excessing temperature Switching the vacuum system on off First start up of the vacuum system l In REMOTE mode the start stop drive of the vacuum system passes through th...

Страница 23: ...exceeds the threshold and is stopped if the current level drops below the threshold and if the time delay s duration has elapsed l LL Mode External u The Load Lock mode is activated and de activated...

Страница 24: ...LL mode EXTERN Standard operational time chart COBRA DS 8163 A Page 24 0870772605 LCD start or Remote start tool pump Pump speed Booster Dry pump Pump ready Process on 1 Cold start 2 MB on delay 60Hz...

Страница 25: ...ec 2 MB on delay 30 sec COBRA DS 8163 A Standard operational time chart 0870772605 Page 25 Pump speed Booster Dry pump Pump ready pump tool Chamber open close gate valve on off 1 Cold start 2 MB on de...

Страница 26: ...oling of the vacuum pump wished or not put the label or warning board Maintenance processing on or next to the vacuum system CAUTION The oil temperature can reach a value of 90 C Danger of burns l Mak...

Страница 27: ...circuit breaker l Switch on the water outlet first then inlet and nitrogen quick connections l Make sure that the Necessary intallation instructions are fol lowed l Start the vacuum system with the r...

Страница 28: ...ccording to applicable regulations Draining used oil NOTE After switching off the vacuum system at normal operating temperature wait no more than 20 minutes before the oil is drained l Make sure that...

Страница 29: ...on again accidentally l Unscrew the filler cap CLF for the cooling liquid l Check the level of the cooling liquid if the cooling liquid level is at the purge cap on cylinder upper plate do not unscrew...

Страница 30: ...removed l Switch on the vacuum system by following the procedure described in the chapter Installation and start up Dismantling and disposal WARNING If the vacuum system has pumped gases that were con...

Страница 31: ...us pump conditions which could cause personal injury Oil quantity The quantity of oil specified in the following table is of informative nature only Check the oil level with the help of the various oi...

Страница 32: ...f informative nature only Respect the procedure of filling the cooling liquid Quantity Zitrec M 25 already mixed ready to use NS 600 C approx 26 litres CAUTION The proportion of pure glycol and water...

Страница 33: ...speed DP 60 Hz min 1 3600 Nominal motor speed with frequency inverter MB 60 Hz min 1 3600 Noise level EN ISO 2151 50 Hz 60 Hz dB A dB A 75 Ambient temperature C F 0 40 32 104 Maximal counter pressure...

Страница 34: ......

Страница 35: ...equipment and following the standards Standard Title of the standard EN ISO 12100 2010 Safety of machinery Basic concepts general principles of design EN ISO 13857 2008 Safety of machinery Safety dis...

Страница 36: ...Majang myun Icheon si Gyunggi do 467 813 Republic of Korea Phone 82 31 645 2700 Fax 82 31 631 2898 e mail busch busch co kr Malaysia Busch Malaysia Sdn Bhd 4 6 Jalan Taboh 33 22 Seksyen 33 Shah Alam T...

Отзывы: