the settings, nomally at 30s). If there are several WY Roots, they
start together.

3) Cold start timer: After the start-up, the WY Roots runs at low
speed for heating-up. It runs normally when the delay of the timer
“COLD START” is done (timer settable in the settings, normally at
1200s).
The timer can be bypassed by pressing the “Start” button 5
seconds.

4) Ready for work: When the COBRA NS pump and the WY Roots
pump are hot, the pump can normally work for the customer
process.

5) Purge time: When the “Stop” button is pressed only one time,
the “PURGE TIMER” starts. When the timer is done (timer settable
in the settings, normally at 1800s), the pump switches off
normally. This timer can be desactivated by the parameter “PURGE
CYCLE = OFF” in the settings. The timer can be bypassed by
pressing the “Stop” button 10 seconds.

6) Stop sequence: All the WY Roots pumps are firstly stopped and
then all the COBRA NS vacuum pumps stop 60 seconds after. The
timer can not be modified.

Structure

The vacuum sytem COBRA DS is made of the following elements:

a) One or more COBRA DP 600 C (DP1, DP2, DP3...) backing
vacuum pumps with sensors

b) Horizontal silencer mounted on each vacuum pump (standard)

c) Vertical silencer installed behind each vacuum pump
to collect condensates in an external tank. This silencer is water
cooled (29 l/min) (option)

d) Connection kit MB to DP. The kit contains different parts (solid
pipes with belows and o-rings hold by claws and screws). Each kit
depends on the pump configuration. If there are only one DP 600
and one WY Roots (DS 8161 for example), the connexion is
directly made from the MB Roots to the DP 600.

e) One or more WY A075 boosters (MB1, MB2...) rotary lobes
vacuum pumps with sensors and frequency inverter.

f) An electrical box mounted on the right or rear side of the MB
booster with combined cables (powers and sensors) for each
pump.

g) An LCD controller.

h) Nitrogen and water distributor if several pumps (DP and/ or
MB) or options (vertical silencer) are used.

i) Other special parts if the vacuum system is specially large extra
(extra inlet or exhaust piping, special power cables rack).

All parts of the installation are mounted on a stable frame and are
completely equipped with their pipes.

The electrical components are wired with an connection box.

Combi DS 8163 A: one Roots WY A075 and one COBRA DP 600 C
pump (Separate electrical box and vertical silencer (option)):

Oil circulation

Since the complete operating principle works without contact, no oil
circuit is needed in the work area.

Cooling

WARNING

The cooling liquid system is active only when the DP vacuum pumps
are in function. The cooling liquid circuit works on the axe of the
motor.

WARNING

The cooling water system is always active. The cooling water flows
continously from the water distributor.

The vacuum system COBRA NS is cooled by

the circuit of cooling liquid (mix of water and glycol) inside the
water chambers (6) of cylinder and endplate of cylinder B-side An
indirect circuit is made with a water pump mounted at the motor
endplate. The flow of the cooling water is controlled by a flow
switch FS 1. If the flow is under 1 l/min during a minimum time of
30 seconds, then the pump stops.
The temperature switch TS 2 will give an emergency signal if the
temperature of the cooling liquid is above 100°C.

a cooling water circuit (4) in the cylinder and endplate of cylinder
B-side. The cooling water flow is controlled by the thermostatic
valve TR whose temperature sensor is assembled in the cylinder
cover side A. The position of the thermostatic valve is leaded of
factory with 3,5 (higher value will set hotter temperature into the
cylinder). Normally setted at position 2,5.

a direct cooling water circuit in the motors of COBRA NS vacuum
pump. The cooling water flow is preset at 29 l/min at the factory
and can be adjusted with valve CWV 1. The flow is controlled by
flow switch FS 2. The cooling water circuit stabilizes the
temperature of cooling liquid. When flow is too low a warning
then an alarm signal is generated by flow switch FS 2 to the PLC.
Status of the pump depends on the alarm function set by user
(factory setting: EMO, pump stops after alarm condition).

a direct cooling water circuit in the motors of WY rotary lobes
vacuum pump. The cooling water flow is preset at 29 l/min at the
factory and can be adjusted with valve CWV 2. The flow is
controlled by flow switch FS 3. The cooling water circuit stabilizes
the temperature of coolong liquid. When flow is too low a warning
then an alarm signal is generated by flow switch FS 3 to the PLC.
Status of the pump depends on the alarm function set by user
(factory setting: EMO, pump stops after alarm condition).

NOTE

:

The COBRA DS vacuum systems are generally dispatched with oil
and cooling liquid already in the vacuum system but, without
cooling water. Before vacuum system first startup, control the oil
level and the cooling liquid level. In the event of absence of one or
the other of these lubricants, please carry out the filling (please
refer to the various chapters of filling). Do not forget to connect
the cooling water supply before the first startup. Operation
without these coolants can result in damage to the vacuum system.

The CWM 1 and CWM 2 captors are serial connected. One alarm
signal is generated for the both.

Nitrogen system

WARNING

The nitrogen system is active only when the DP vacuum pumps are
in function. The electrovalve is controlled by KDP.

The nitrogen system performs two main functions:

nitrogen is used as dilution gas. It is injected in the middle hole (9)
and is preset at 20 l/ min. It can be adjusted with valve DGR 1,
depending on the application. But higher the dilution flow is,
worse the base pressure will be. Nitrogen flow injected in the hole
on cylinder endplate side (8) is preset at 40 l/ min and can be
adjusted with valve DGR 2, depending on the application. When
flow is too low a warning then an alarm signal is generated by flow

Product description

COBRA DS 8163 A

Page 10

0870772605

mi n

m a x

m i n

m ax

m in

ma x

Ty pe

N o

P

O per at ing  f re quency  max.

T ype

N o

P

O per at in g f r equency  m ax.

U  r ange
P  r ated
I  r ated

I max

I cu

F
E lect ri cal

sche mat ics

Содержание COBRA DS 8163 A

Страница 1: ...i Screw and Roots Vacuum Pumps COBRA DS 8163 A Standard version Busch Manufacturing Korea Ltd 189 51 Soicheon ro Majang myun Icheon si Gyunggi do 467 813 Republic of Korea 0870772605 181024 Original i...

Страница 2: ...24 Signal control mode Select LL mode EXTERN 24 Current control mode Select LL mode AUTO 25 Maintenance 26 Maintenance program 26 Daily 26 Weekly 26 Monthly 26 Yearly 27 Every 16000 hours of operatio...

Страница 3: ...VFD DP3 DP1 DP2 MB PTB COBRA DS 8163 A MB Roots WY A075 DP 1 Backing vacuum pump DP 600 C DP 2 Backing vacuum pump DP 600 C DP 3 Backing vacuum pump DP 600 C IN Inlet MB Roots WY A075 PTB Pump termin...

Страница 4: ...COBRA DS 8163 A Page 4 0870772605 ESS OUT ECO MSF PTB COBRA DS 8163 A ECO Eletrical power supply ESS Emergency stop switch MSH Main switch OUT Discharge PTB Pump terminal box...

Страница 5: ...on gas end of cylinder ECO Combined power and sensor connection EV Expansion vessel FME Flow meter nitrogen FS 1 Flow switch cooling liquid FS 2 Flow switch cooling water HE Heat exchanger IN Inlet MV...

Страница 6: ...CWC Cooling water connection CWV 2 Regulating valve cooling water ECO Electrical connection FS 3 Flow switch cooling water IN Inlet MTB Motor terminal box ODP Oil drain plug OFP Oil fill plug OSG Oil...

Страница 7: ...cer BUPS Back up power supply CWC Cooling water connection ECP Ground EOCR Electronic Over Current Relay EXB Extension board PLCM PLC module RC Remote control MAC Magnetic contactor MCP Motor Circuit...

Страница 8: ...lating valve cooling water DGR 1 Regulating valve dilution gas middle of cylinder DGR 2 Regulating valve dilution gas end of cylinder ECO Combined power and sensor connection EV Expansion vessel FME F...

Страница 9: ...essured gas is conveyed to the re spective silencers Principle of the screw vacuum pump DP The COBRA NS vacuum pumps work by the principle of screw pumps Two parallel screws 7 rotate in opposite direc...

Страница 10: ...ounted at the motor endplate The flow of the cooling water is controlled by a flow switch FS 1 If the flow is under 1 l min during a minimum time of 30 seconds then the pump stops The temperature swit...

Страница 11: ...s realised by the LCD The vacuum pump is delivered with a circuit breaker Safety Intended use DEFINITION To rule out any misunderstanding the term handling of the vacuum system covers transport storag...

Страница 12: ...TE Type 2 work includes tasks where the energized circuits are or can be measured by placing probes through suitable openings in the covers or insulators Type 3 Equipment is energized Energized circui...

Страница 13: ...l the BUSCH Semicon service team in charge of the maintenance of the pumps l Before restarting the vacuum system reactivate the FDP1 thermal relay by pressing on Reset If this does not work wait 60 se...

Страница 14: ...S 1 FS 2 Depends on alarm function set in the PLC for water flow Set at factory General Stop ie the contactors open and remove power to mo tors S Nitrogen flow to low Nitrogen flowmeter FME Depends on...

Страница 15: ...a means of adapted lifting control the slope of the vacuum system 5 The packaging material must be disposed of in accordance with local and national regulations This handbook is contained in the deli...

Страница 16: ...5 bar Approximate flow rate 0 200 l min l Make sure that the ambient conditions correspond to the protection class of the motor according to nameplate l Make sure that the vacuum system is placed on o...

Страница 17: ...bstances must be pre vented l Make sure that the intake lines are equipped with a shut off device upstream of the intake flange so that the flow of sucked gas can be stopped l Make sure that the intak...

Страница 18: ...If the direction is wrong an error message appears on the LCD reverse two connection phase poles Electrical connection The vacuum system is build with voltage from 208 to 480 Volts WARNING Risk of ele...

Страница 19: ...ll in by filler hole until cooling liquid flows by purge cap on cylin der endplate B side gearings l Stop filling in cooling liquid l Close the purge cap on cylinder endplate B side l Fill in again by...

Страница 20: ...ight glasses l Make sure that the seals of the oil filler cap are not damaged Replace them if necessary l Screw on the oil filler cap hermetically tight COBRA DS vacuum system NOTE It is easier to swi...

Страница 21: ...m system is unavoidable wait until the surface temperature has cooled down or wear protective gloves CAUTION The intensity of the noise of the vacuum system is higher within a certain area of the vacu...

Страница 22: ...vacuum system deterioration by excessing temperature Switching the vacuum system on off First start up of the vacuum system l In REMOTE mode the start stop drive of the vacuum system passes through th...

Страница 23: ...exceeds the threshold and is stopped if the current level drops below the threshold and if the time delay s duration has elapsed l LL Mode External u The Load Lock mode is activated and de activated...

Страница 24: ...LL mode EXTERN Standard operational time chart COBRA DS 8163 A Page 24 0870772605 LCD start or Remote start tool pump Pump speed Booster Dry pump Pump ready Process on 1 Cold start 2 MB on delay 60Hz...

Страница 25: ...ec 2 MB on delay 30 sec COBRA DS 8163 A Standard operational time chart 0870772605 Page 25 Pump speed Booster Dry pump Pump ready pump tool Chamber open close gate valve on off 1 Cold start 2 MB on de...

Страница 26: ...oling of the vacuum pump wished or not put the label or warning board Maintenance processing on or next to the vacuum system CAUTION The oil temperature can reach a value of 90 C Danger of burns l Mak...

Страница 27: ...circuit breaker l Switch on the water outlet first then inlet and nitrogen quick connections l Make sure that the Necessary intallation instructions are fol lowed l Start the vacuum system with the r...

Страница 28: ...ccording to applicable regulations Draining used oil NOTE After switching off the vacuum system at normal operating temperature wait no more than 20 minutes before the oil is drained l Make sure that...

Страница 29: ...on again accidentally l Unscrew the filler cap CLF for the cooling liquid l Check the level of the cooling liquid if the cooling liquid level is at the purge cap on cylinder upper plate do not unscrew...

Страница 30: ...removed l Switch on the vacuum system by following the procedure described in the chapter Installation and start up Dismantling and disposal WARNING If the vacuum system has pumped gases that were con...

Страница 31: ...us pump conditions which could cause personal injury Oil quantity The quantity of oil specified in the following table is of informative nature only Check the oil level with the help of the various oi...

Страница 32: ...f informative nature only Respect the procedure of filling the cooling liquid Quantity Zitrec M 25 already mixed ready to use NS 600 C approx 26 litres CAUTION The proportion of pure glycol and water...

Страница 33: ...speed DP 60 Hz min 1 3600 Nominal motor speed with frequency inverter MB 60 Hz min 1 3600 Noise level EN ISO 2151 50 Hz 60 Hz dB A dB A 75 Ambient temperature C F 0 40 32 104 Maximal counter pressure...

Страница 34: ......

Страница 35: ...equipment and following the standards Standard Title of the standard EN ISO 12100 2010 Safety of machinery Basic concepts general principles of design EN ISO 13857 2008 Safety of machinery Safety dis...

Страница 36: ...Majang myun Icheon si Gyunggi do 467 813 Republic of Korea Phone 82 31 645 2700 Fax 82 31 631 2898 e mail busch busch co kr Malaysia Busch Malaysia Sdn Bhd 4 6 Jalan Taboh 33 22 Seksyen 33 Shah Alam T...

Отзывы: