background image

l

Put the label or warning board “Maintenance processing” on or
next to the pump

Safety Lockout procedure

l

Take off the label or warning board “Maintenance processing”

l

Check the oil level according to the chapters “Checking the oil
level”

l

Switch on the customer’s power supply

l

Switch on the water quick connections (outlet first, then inlet)

l

Start the pump with the remote control (press on START button) or
with the Start/ Stop button

Transport

The COBRA BC vacuum pumps are tested and checked in our factory
before careful packing. Check the packaging for transport damage
when the goods arrive. The pump can withstand temperatures
between -25°C and +55°C during transport.

Transport in packed state

Packed on a pallet, the vacuum pump can be moved with a hand
forklift truck.

Transport in unpacked state

CAUTION

Do not work, walk or stand under suspended loads.

CAUTION

Please check out the weight of the vacuum pump before lifting it up
(see “Technical Data”).

Use adequate lifting gear for this.

NOTE

: The suspension eyes are located at about the centre-of-gravity

of the vacuum pump. If the vacuum pump is equipped with accessories
that could influence the centre-of-gravity, this must be taken into
account when lifting and a belt must additionally be attached to a
specific point.

l

Fasten the hoist to the suspension eye on the cylinder

l

Use a hoist that is equipped with a hook and safety lock

l

Lift the vacuum pump

CAUTION

The vacuum pump may not be lifted anymore when it has been
filled with oil.

Moving of the vacuum pump is simple using the four wheels placed
under the vacuum pump frame.

Make sure before every transport that the oil has been drained out of
the vacuum pump.

The packaging material must be disposed of in accordance with local
and national regulations.

This handbook is contained in the delivery package.

Transport

BC 0101 G

Page 8

0870704904 (En)

47

3

23.

5

17

2

2.

5

300

340

42

520

584

300

150

Inlet
DN 50 ISO-KF

Outlet

DN 40 ISO-KF

Control Box

Cooling water outlet

Cooling water inlet

Nitrogen inlet

Power connector

IN

OUT

U range
P rated
I rated
Imax

Icu

F
Electrical

schematics

POWER CONNECTOR

C.W. OUTLET

C.W. INLET

N

©ü

 INLET

Tool Interface

Ethernet

PID

Oil = Busch YLC 250 B

n    =

max

p    =

abs

Vacuum Pump

Oil quantity

m

V    =

max

S/N =

Year 2017

Hand pad

Start / Stop button

Warning / Alarm LED

Oil sight glass

23

Power ON LED

ON / OFF

Warning / Alarm

Power

Dimensions drawing

Содержание COBRA BC 0101 G

Страница 1: ...0870704904 0004_en Original instructions Modi cations reserved 20 10 2021 Instruction Manual COBRA Screw Vacuum Pumps BC 0101 G Get technical data instruction manuals service kits...

Страница 2: ...e system 13 Switching the system off 13 Maintenance 13 Maintenance program 14 Weekly 14 Monthly 14 Yearly 14 Every 16 000 hours of operation at the latest after 4 years 14 Lock Out Tag Out procedure 1...

Страница 3: ...control Interface CWC Cooling water connections TIC Tool interface connection HC Handpad connection EB Eye bolts CP PLC box PB Start Stop button PL Power led ES Warning Alarm led OSG Oil sight glass...

Страница 4: ...erned the vacuum pump is suitable for evacuation of a 300 liters tank The vacuum pump is not suitable for continuous duty at a pressure more or equal than 150 hPa mbar Caution the operating cycle of 1...

Страница 5: ...d the design level Example BC 0101 G BC standard version 0101 100 m3 h G Design Safety Intended use DEFINITION To rule out any misunderstanding the term handling of the vacuum pump covers transport st...

Страница 6: ...wer supply l Switch off the water quick connections inlet first then outlet l Put the label or warning board Maintenance processing on or next to the pump Safety Lockout procedure l Take off the label...

Страница 7: ...rs and corresponding actions Without this form duly completed and signed by a legally responsible person the pump should not be disassembled l Proceed to disassembly of the vacuum pump Please make sur...

Страница 8: ...cuum pump is equipped with accessories that could influence the centre of gravity this must be taken into account when lifting and a belt must additionally be attached to a specific point l Fasten the...

Страница 9: ...n and start up Necessary installation instructions CAUTION If the necessary installation instructions are not followed and particularly in the case of inadequate cooling Risk of damage to and total de...

Страница 10: ...e case of long intake lines the line cross section should be larger than the intake flange to prevent a drop in the performance of the vacuum pump If you have any doubts contact your Busch representat...

Страница 11: ...OBRA BC 0101 G vacuum pumps are always delivered without oil see the chapter Oil types for information on the recommended oils l Prepare the quantity of oil specified in the table Oil quantity Oil fil...

Страница 12: ...owmeter must be connected in such a way that switching on leads to an alarm and stopping of the vacuum pump when the flow drops below 0 3 l min Saving the operating parameters As soon as the vacuum pu...

Страница 13: ...if the pump is shut down for a longer period of time Drain the cooling water u Pull off the connections for the inlet and outlet of the cooling water u Drain the cooling water completely u If necessa...

Страница 14: ...u Make sure that the operating room is clean and free of dust clean if necessary l Make sure that the vacuum pump has been switched off and that it cannot be switched on again accidentally l Check the...

Страница 15: ...s also a danger to the environment Wear protective clothing when replacing contaminated oil Contaminated oil must be treated specially and must be disposed of according to applicable regulations Drain...

Страница 16: ...collect it in a container l Dispose of the condensate according to applicable environmental protection regulations l Check the sound absorber regularly and clean it if necessary Checking the leak pro...

Страница 17: ...tamination must be documented in a declaration of decontamination Declaration of Decontamina tion which can be downloaded from www buschvacuum com Dispose of the used oil and condensate according to a...

Страница 18: ...ntaminated or polluted oil can lead to hazardous pump conditions which could cause personal injury Oil quantity The quantity of oil specified in the following table is of informative nature only Check...

Страница 19: ...er pressure bar 2 5 Cooling water temperature C 10 25 Weight approx kg 117 Technical data BC0101G NW 0090 A Nominal suction capacity m3 h cfm 90 53 Ultimate pressure hPa mbar mTorr 0 01 7 5 Nominal mo...

Страница 20: ...Safety of machinery Basic concepts general principles of design EN ISO 13857 2019 Safety of machinery Safety distances to prevent hazard zones being reached by the upper and lower limbs EN 1012 1 201...

Страница 21: ...Basic concepts general principles of design Risk assess ment and risk reduction BS EN ISO 13857 2019 Safety of machinery Safety distances to prevent hazard zones being reached by the upper and lower l...

Страница 22: ...Note...

Страница 23: ...Note...

Страница 24: ...Italy info busch it Japan info busch co jp Korea busch busch co kr Malaysia busch busch com my Mexico info busch com mx Netherlands info busch nl New Zealand sales busch co nz Norway post busch no Per...

Отзывы: