Position of the pump gravity center
l
The gravity center of the BC 0101 G pump is determined according
to the drawing
Installation of the vacuum pump in a
seismic zone
l
Convey the pump to its final location with a pallet truck before
removing it from its support
l
Unscrew the fixing screws of the pump on the transport pallet and
remove the machine from its support with an appropriate lifting
system by using the lifting brackets made for this purpose
l
Check that the wheels no longer touch the ground
CAUTION
The vacuum pump is fixed to the ground with four M10 screws, one
screw per bracket. The fixing screw must stand a 1200 N tensible
force (per bracket).
The final user must adapt the type od screws depending on the
ground material.
The ground space requirement for the brackets is to be read on the
following figure
Information over the lubricants
Oil
Busch YLC 250 B n°.-art. 0831 000 054 (0.5l of Busch YLC 250 B)
Quantity: BC 0101 G : 0,12 l
Replacement: After 16’000 h (see Maintenance chapter, page 13)
Decommissioning procedure
When the product arrives at the end of the lifetime, it is necessary to
proceed to the decontamination of the vacuum pump
WARNING
Any disassembly of the vacuum pump should only be carried out by
staff trained for this purpose. Before disassembly, the user of the
vacuum pump should complete a form or “Declaration about
absence of danger” which indicates any dangers and corresponding
actions.
Without this form duly completed and signed by a legally
responsible person, the pump should not be disassembled.
l
Proceed to disassembly of the vacuum pump. Please make sure to
wear a personal protective equipment (PPE) prior to any
intervention on the vacuum pump. Some residue may remain
inside.
l
Proceed to decommissioning of the different parts according to the
current local and national laws
Appliance after warehousing
Prior to reoperate a vacuum pump which remained outside the buiding
for a certain period of time, make sure to let it stand at ambient
temperature in a room for a whole day.
Lock out/ Tag out for hydraulics
u
Hydraulics: cooling water
u
Pnematics: nitrogen
Lock Out/ Tag Out procedure (Type 1 of
electrical work)
l
Stop the pump with the remote control (press on STOP button
during 10s) or with the Start/ Stop button (press it during 2 s)
l
Switch off the customer’s power supply
l
Switch off the water quick connections (inlet first, then outlet)
l
Put the label or warning board “Maintenance processing” on or
next to the pump
The end user is responsible for providing energy isolation capabilities
on the water
Lock Out/ Tag Out procedure
l
Stop the pump with the remote control (press on STOP button
during 10s) or with the Start/ Stop button (press it during 2 s)
l
Switch off the customer’s power supply
l
Switch off the water quick connections (inlet first, then outlet)
BC 0101 G
Safety
0870704904 (En)
Page 7
Eyebolt
Adjusting leveler
Wheel
ELECTRICAL PRINCIPLE OF OPERATION
DP Motor
Klixon
B1
ELECTRICAL
POWER
EMC
Filter
Frequency
inverter
Emergency
stop
Содержание COBRA BC 0101 G
Страница 22: ...Note...
Страница 23: ...Note...