Commissioning | 6
0870557375_NC2000B_VR_Ex_A0002_IM_en
23 / 36
6
Commissioning
NOTICE
The machine may ship without oil.
Operation without oil will ruin the machine in short time!
• Prior to commissioning, the machine must be filled with oil, see
Filling Oil [
►
14]
.
NOTICE
Lubricating a dry running machine (compression chamber).
Risk of damage to the machine!
• Do not lubricate the compression chamber of the machine with oil or grease.
CAUTION
During operation the surface of the machine may reach temperatures of more than
70°C.
Risk of burns!
• Avoid contact with the machine during and directly after operation.
CAUTION
Noise of running machine.
Risk of damage to hearing!
If persons are present in the vicinity of a non noise insulated machine over extended
periods:
• Make sure that ear protection is being used.
6.1 Start-Up
• Make sure that the installation conditions (see
Installation Conditions [
►
11]
) are
complied with.
• Turn on the cooling liquid supply (CLI) and adjust flow rates, see
Cooling Liquid Con-
nection [
►
13]
.
• Switch on the machine
• Make sure that the maximum permissible number of starts does not exceed 6 starts
per hour.
• Make sure that the operating conditions are complied with, see
Operating Parameters
[
►
20]
and
Technical Data [
►
33]
.
• Open the cooling liquid injection, see
Cooling Liquid Connection [
►
13]
.
• After a few minutes of operation, perform an
Oil Level Inspection [
►
26]
.
As soon as the machine is operated under normal operating conditions:
• Measure the motor current and record it as reference for future maintenance and
troubleshooting work.