Boiler Installation
4
7
We reserve the right to make any changes due to technical modifications!
Boiler Installation and Maintenance Manual SB735 • Issue 10/2003
Buderus Heiztechnik GmbH • http://www.heiztechnik.buderus.de
4
Boiler Installation
It is required to have a floor drain available near the
boiler.
It is recommended to place the boiler on solid foundation
of 2" to 4 " height. Use dimension B and L (Table 3) to
size this foundation.
The supporting floor must be level and of sufficient
strength.
Observe the indicated side clearances when placing the
boiler (Fig. 2). Dimensions shown indicate minimum
clearances to combustibles or space needed to swing
open burner door.
Place the boiler horizontally on the supporting
foundation.
J
NOTICE!
Make sure to install the base supplied with the
SB735/1200.
Fig. 2
Clearance dimensions for SB735 boilers
Boiler
Model
L
[Inch]
BK
[Inch]
A
[Inch]
790
91
43
¾
98“(43“)*
970
107
½
43
¾
98“(43“)*
1200
107
½
46
98“(43“)*
Table. 3 Minimum Boiler Pad
Please observe the burner length
L
Br
with respect to the front
clearance.
AL
8“
32“
1)
L
Br
(0)
B
k
(4“)
(40
“)