Boiler Assembly
6
16
We reserve the right to make any changes due to technical modifications!
Boiler Installation and Maintenance Manual SB735 • Issue 10/2003
Buderus Heiztechnik GmbH • http://www.heiztechnik.buderus.de
6.4
Installation of the Control Panel
and Sensor Well
The optional Buderus control panel „Logamatic“ is
secured by fixing two hooks into the two holes in the
front top cover.
Control panel „Logamatic“ 2000 series
z
Unscrew both self-tapping screws from the top out of
the terminal cover and remove the cover (Fig. 17).
z
Route the capillary tubes through the cable raceway
and unroll to the required length.
z
Locate the control panel so that the insert hooks are
inserted at the front into the oval holes, pull the
control panel forward and then tilt it back, until both
resilient hooks snap into place on the right and left
side (arrows Fig. 17).
z
Secure the control panel to the front top cover on left
and right inside in the cable raceway using two self-
tapping screws.
J
NOTICE!
If necessary, break or cut out the knock-out
from the rear wall of the control panel (Fig. 18).
Make all electrical connections in accordance with the
wiring diagram and local code requirements.
z
Insert cable clips into the clip frame and secure by
pivoting the lever (Fig. 18).
z
Insert both lower hooks on the right and the left side
of the rear wall section into the clip frame, keeping
the slot in the upper edge (Fig. 18).
z
Press both upper resilient sliding hooks slightly
inwards (arrows on Fig. 18) and insert the rear wall
section so that both hooks lock into place.
z
Locate the terminal cover and re-fit using the self-
tapping screws (Fig. 17).
J
NOTICE!
Pay particular attention to the cable and
capillary runs! Do not kink the capillaries.
Connect the appliance with a permanent main
electrical disconnect!
Observe the local code requirements!
Fig. 17
Install the control panel
Fig. 18
Installation of the cable clips